Published On:October 9 2015
Story Viewed 1449 Times
TS Genco commissions unit-2 of Lower Jurala Hydel Project at Revulapally.
The Telangana State Power Generation Corporation Limited has announced the commissioning of the 40 MW Unit-2 of the Lower Jurala Hydro Electric Project on the river Krishna.
This is part of the 6x40 MW hydel project being implemented by TS Genco at Revulapally village in Mahabubnagar district of Telangana.
With the commissioning of the second unit the TS Genco is now in a position to supply additional power during peak hours and when water is available. This unit is part of the Lower Jurala Hydro Electric Project now under development, aimed at utilising the units during the monsoon season and when there is good water flow into the project.
Ch.Venkata Rajam, Director, in a statement said the unit commenced operations on October 5 and managed to take average load of 40.46 MW and the performance of the unit was as per expectations.
HBL