Published On:September 6 2024
Story Viewed 295 Times
"Land Acquisition for New Yerpedu-Pudi Railway Line to Start Soon, Says Tirupati MP"
Tirupati MP Dr. M. Gurumoorthy announced that the land acquisition for the new railway line connecting Yerpedu and Pudi stations will begin soon. This development is part of broader efforts to improve rail infrastructure in the region.
On Wednesday, Dr. Gurumoorthy reviewed modernization efforts at Tirupati railway station, which serves approximately six crore passengers annually. The Union Government plans to enhance the station’s amenities to international standards with a substantial investment of ₹300 crore.
To address traffic bottlenecks between Tirupati and Renigunta, the construction of three under-bridges near level crossings at Carriage Repair Shop, Cotton Mill, and Chintalachenu is underway. Dr. Gurumoorthy noted that cable shifting is in progress and excavation for these under-bridges will begin shortly. He emphasized the need for measures to prevent water stagnation during the rainy season.
Additionally, Dr. Gurumoorthy reviewed progress at Renigunta Junction, which is set to receive ₹200 crore for modernization. A new railway bridge is proposed at the Santha Gate level crossing. He also highlighted the long-standing issue of water stagnation in a 1200-meter drain adjacent to the railway track, stressing the need for desilting.
Furthermore, a third railway line between Tirupati and Gudur has been sanctioned, which is expected to alleviate congestion for long-distance trains.
ET