Published On:April 15 2019
Story Viewed 1516 Times
First multi-modal terminal faces land, capacity challenges in Varanasi.
Last November, the Prime Minister inaugurated the new Multi-Modal Terminal on the Ganges in Varanasi and received the first container cargo via the inland waterway. Since then, only one other cargo container has docked here, and none has departed.
The highway and rail connectivity which form the other ‘modes’ of the terminal are yet to be constructed and connected to the water terminal. The root of the delay is the difficulty in acquiring land.
BS