Published On:December 1 2021
Story Viewed 2107 Times
Dilip Buildcon is lowest bidder for rail project in Himachal Pradesh.
BSE-listed Dilip Buildcon Ltd. has been declared the lowest bidder for a tender floated by Rail Vikas Nigam in Himachal Pradesh, according to a stock exchange filing.
The work includes slope protection and allied works in connection with the Bhanupali-Bilaspur-Beri new railway line in Bilaspur district. The project cost is Rs. 636.94 crore and it has to be completed in 24 months.
HBL