Published On:August 10 2015
Story Viewed 2278 Times
Commencement of Commercial Operations.
MBL (MP) Toll Road Company Limited (MBLTRCL), a Wholly Owned Subsidiary of MBL Infrastructures Limited (MBL) has commenced commercial operations of its Toll Road project of Waraseoni – Lalbarra section from SH-54 junction at Km 0/10 to 19/43 at SH-26 Junction in the state of Madhya Pradesh, on design, built, finance, operate and transfer (DBFOT) Toll plus Annuity basis.
MBLTRCL will have the benefit of toll collection as well as receipt of semi annuity of
Rs. 3.26 Crores over the Concession Period of 15 years (including construction period).
The BOT project of 114 km long Seoni - Balaghat - Gondia State Highway, in the state of Madhya Pradesh is already operational since February, 2008 implemented through AAP Infrastructure Limited, a Wholly Owned Subsidiary of MBL.
www.mblinfra.com