| Total 191 projects are covered in this issue. Updated between Apr 28- May 07 20 |
|
Railway
|
|
|
Railway siding project at NMDC's upcoming Nagarnar steel plant in Chhattisgarh.
Railway siding project at NMDC's upcoming Nagarnar steel plant in
Chhattisgarh.
Union minister for steel and mines, Narendra Singh Tomar
performed Bhoomi Puja...Read More
|
|
College
|
|
|
Construction of Hydro Engineering College in Bilaspur, Himachal Pradesh.
Construction of Hydro Engineering College in Bilaspur, Himachal
Pradesh.
Himachal Pradesh government in July 2016 had signed special
memorandum of understanding (MoU) with...Read More
|
|
Chemical
|
|
|
FMC India plans to set up an chemicals mfg unit in IDA Patancheru, dist. Medak, Telangana
FMC India plans to set up an chemicals mfg unit in IDA Patancheru, dist.
Medak, Telangana.
The cost of the project is...Read More
|
|
Black Rose Industries is planning to set up a polyacrylamides powder unit in Gujarat.
Black Rose Industries is planning to set up a polyacrylamides powder unit
in Gujarat.
Project will spread over 34,075 sq mtr of...Read More
|
|
Drugs & Pharma
|
|
|
Tergene Biotech is setting up a GMP facility at Hyderabad.
Tergene Biotech is setting up a GMP facility at Hyderabad for
manufacturing of vaccines, biopharmaceuticals and probiotics.
Work on
the facility...Read More
|
|
Solara Active Pharma Sciences is planning to build a drug manufacturing unit in Visakhapatnam.
Solara Active Pharma Sciences is planning to build a drug manufacturing
unit in Visakhapatnam.
The project will be implemented in two phases.
Phase-I...Read More
|
|
Roadways
|
|
|
Construction of four underpasses on Noida-Greater Noida Expressway.
Construction of four underpasses on Noida-Greater Noida Expressway.
The
first underpass will be constructed for the first 2.36 km through box
pushing technology....Read More
|
|
Fertiliser
|
|
|
Revival of a fertiliser plant at Ramagundam.
Revival of a fertiliser plant at Ramagundam.
It will have a urea
capacity of 13 lakh tonnes.
The plant is being revived by...Read More
|
|
Bulk Drug
|
|
|
Virupaksha Organics plans to set up bulk drugs and intermediates unit in Gadvanthi
Virupaksha Organics plans to set up bulk drugs and intermediates unit in
Gadvanthi
Jan 2015: The work on project is kept on...Read More
|
|
Inchem Laboratories plans to set up an bulk drugs & intermediates unit in Nanded
Inchem Laboratories plans to set up an bulk drugs & intermediates
manufacturing project at Village Krushnoor, dist.
Nanded
Jan.2015:Project is kept on hold...Read More
|
|
Formulation
|
|
|
Lakshmi Saras Chemtech plans to set up an active pharma ingredients unit in Pashamailaram
Lakshmi Saras Chemtech plans to set up an active pharma ingredients unit
1.5 TPM to 15 TPM at Village Pashamailaram, dist....Read More
|
|
Adroit Pharmaceutical plans to set up an bulk drugs & pharmaceuticals mfg unit in Amadi, Nagpur
Adroit Pharmaceutical plans to set up an 2,684 TPM bulk drugs &
pharmaceuticals mfg unit in Amadi, dist. Nagpur
Mar 2017 :...Read More
|
|
Multiplex
|
|
|
PVR plans to set up open screen Across india
PVR plans to set up open screen Across
Dec 2017 : Project is
under-construction scheduled to be completed in 2020.
June 2018...Read More
|
|
R&D Centre
|
|
|
Sri Biotech Laboratories India is implementing an Integrated discovery centre at Genome
Sri Biotech Laboratories India is implementing an Integrated Discovery
Centre at Genome Valley, dist. Rangareddy
The project is also
manufacturing of probiotic powder,...Read More
|
|
Dyeing
|
|
|
Shan Textiles Pvt.Ltd plans to set up an dyeing of fabrics in Surat
Shan Textiles Pvt.Ltd plans to set up an dyeing of fabrics in
Surat.
Oct 2019 ; Work on project is still...Read More
|
|
Hydel
|
|
|
Neepco plans to set up second phase of Upper Siang hydropower project.
Neepco plans to set up second phase of Upper Siang hydropower
project.
RusHydro International AG, has signed a contract with NEEPCO
(India) to...Read More
|
|
Umngot Power project : Awaiting for EC
Meghalaya government is in the process of setting up 240 MW Umngot Power
project.
The estimated cost of the Umngot...Read More
|
|
The Rangit IV hydel power project.
The Rangit IV hydel power project.
The Rangit IV project of 120 MW
capacity was awarded to Jal Power Corporation Ltd....Read More
|
|
Department of Power plans to set up an 42 MW Lower Tizu hydel based power unit at Kiphire, Tuensang
The project envisages setting up of 42 MW Lower Tizu hydel based power unit
at Kiphire in Tuensang district of Nagaland.
June...Read More
|
|
Implementation of Kopili Hydro Electric Project.
Implementation of Kopili Hydro Electric Project.
The North Eastern
Electric Power Corporation has invited bids for design, fabrication,
supply, erection, testing and...Read More
|
|
Solar
|
|
|
Kpi Global Infrastructure plans to set up electric power generation of solar energy unit in bharuch
Kpi Global Infrastructure Ltd. plans to set up electric power generation
using solar energy unit in bharuch
Feb 2015 : Work on...Read More
|
|
Developmnet of the 28-MWh solar-cum-storage project in the Andaman islands.
Developmnet of the 28-MWh solar-cum-storage project in the Andaman
islands.
Mahindra Susten had won the bid to set up the 28-MWh project
for...Read More
|
|
Development of 100 MW Ramagundam Floating Solar PV Project, Phase-I in Peddapelli district of Telangana.
Development of 100 MW Ramagundam Floating Solar PV Project, Phase-I in
Peddapelli district of Telangana.
NTPC has floated tenders for design,
engineering,...Read More
|
|
Bagasse
|
|
|
Dnyanyogi Shri Shivakumar Swamiji Sugars plans to expand its bagasse-based co-gen power unit
The project envisages expansion of its bagasse-based co-gen power unit in
Bijapur dist. of Karnataka.
Oct 2014: Work on project is...Read More
|
|
PKDNANHKASSK plans to set up a bagasse-based cogen power unit in sangli
Padmabhushan Krantiveer Dr. Nagnath Anna
Nayakawadi Hutatma Kisan Ahir
Sahakari Sakhar Karkhana is planning a bagasse-based cogen power unit in
Sangli dist., Maharashtra.
The...Read More
|
|
Krishnakath Agro Process plans to set up an bagasse-based co-gen power plant in Sangli
Krishnakath Agro Process plans to set up an bagasse-based co-gen power
plant in dist. Sangli, Maharashtra.
Aug 2015 : Work on project...Read More
|
|
Ganpati Sugar Industries plans to set up an bagasse-based CPP at Chowtkur dist. Medak
Ganpati Sugar Industries plans to set up an bagasse-based captive power
plant at Chowtkur Village, dist. Medak, Telangana
Feb 2016 : Land...Read More
|
|
Rice Husk
|
|
|
Kuantum Papers plans to set up an coal-based & rice husk-based power unit from at Garhshankar
Kuantum Papers plans to set up an expansion of its coal-based & rice
husk-based power unit from at Garhshankar, Hoshiarpur.
May 2015...Read More
|
|
Coal
|
|
|
Ghatampur supercritical thermal power project.
The Neyveli Lignite Corporation, in collaboration with the Uttar Pradesh
Rajya Vidyut Utpadan Nigam Ltd, will set up a 1,980 MW...Read More
|
|
Narbheram Power & Steel is planning a captive steel plant
Narbheram Power & Steel is planning to raise the capacity of its sponge
iron unit from 0.1 to 0.5 million tonne....Read More
|
|
JR Metal Chennai is implementing a coal-based captive power plant in Tiruvallur
JR Metal Chennai plans to set up a coal-based
captive power plant in
Tiruvallur, Tamil Nadu.
Jan.2015:Work on project is in progress.
July
2015 :...Read More
|
|
Hospital
|
|
|
ISPAT Post Graduate Medical Institute and Super Specialty hospital project
SAIL is constructing 'ISPAT Post Graduate Medical Institute and Super
Specialty hospital at Rourkela Steel Plant, Rourkela'.
wherein NBCC will
work...Read More
|
|
Construction of additional 200 bed block in Shri Vinoba Bhave Civil Hospital Silvassa.
Construction of additional 200 bed block in Shri Vinoba Bhave Civil
Hospital Silvassa.
The Public Works Department, Dadra & Nagar Haveli has
floated...Read More
|
|
Irrigation
|
|
|
Modernise the Upper Krishna Irrigation project (UKIP) in Karnataka.
Modernise the Upper Krishna Irrigation project (UKIP) in Karnataka.
The
project includes expanding the command area of UKIP to provide irrigation
facilities to...Read More
|
|
Sitarama Lift Irrigation project (Phase-I).
Sitarama Lift Irrigation project (Phase-I).
The work involves diverting
70.40 TMC Godavari river water from upstream of existing Dummugudem anicut
to irrigate 2,72,921...Read More
|
|
Implementation of Yettinahole project in Karnataka.
Implementation of Yettinahole project in Karnataka.
Phase-I of the
project is expected to be completed by June 2020. This includes lift
component work,...Read More
|
|
Dam
|
|
|
Construction of Mohmela Sirpur barrage in Arang taluka of Raipur.
Construction of Mohmela Sirpur barrage in Arang taluka of Raipur.
The
Water Resources Department, Chhattisgarh, has invited bids for construction
of barrage and...Read More
|
|
Water
|
|
|
GVMC plans a pipeline from Padmanabhapuram to VIMS.
GVMC plans a pipeline from Padmanabhapuram to VIMS connecting it to an
existing pipeline at a cost of Rs. 39 crore...Read More
|
|
GVMC plans a pipeline from Aganampudi filtration plant to Anakapalle.
GVMC plans a pipeline from Aganampudi filtration plant to
Anakapalle.
The 27 km pipeline at a cost of Rs 40 crore is...Read More
|
|
GVMC plans a pipeline from Aganampudi to the Narava filtration plant.
GVMC plans a pipeline from Aganampudi to the Narava filtration plant....Read More
|
|
Water Supply
|
|
|
Majhgain rural water supply scheme in Panna.
Majhgain rural water supply scheme in Panna.
Madhya Pradesh Jal Nigam
Maryadit has invited bids for execution of
Majhgain scheme in Panna of
Madhya...Read More
|
|
Water Treatment
|
|
|
Implementation of 68 MLD sewage treatment plant at Jagjeetpur in Haridwar district of Uttarakhand
Uttarakhand Peyjal Sansadhan Vikas Avam Nirman Nigam is implementation of
68 MLD sewage treatment plant at Jagjeetpur in Haridwar district...Read More
|
|
Resort
|
|
|
APTDC is implementing an 3 star resort at Bermpark, Vijayawada in Krishna district
Andhra Pradesh Tourism Devp. Corpn is implementing an 3 star resort at
Bermpark, Vijayawada in Krishna district of Andhra Pradesh
July 2017...Read More
|
|
Hotel
|
|
|
Carlson Rezidor plans to set up 'Radisson Red' in Mohali.
Carlson Rezidor plans to set up 'Radisson Red' in Mohali.
Nov 2017 :
Project is under-construction scheduled to be completed in next
year.
May...Read More
|
|
Sikka Superb Spaze is developing 'Sikka Hotel' at Sahastradhara Road in Dehradun.
Sikka Superb Spaze is developing 'Sikka Hotel' at Sahastradhara Road in
Dehradun.
The project will spread over two acre of land, comprises...Read More
|
|
Boutique hotel and convention centre in Shilparamam of Visakhapatnam.
Boutique hotel and convention centre in Shilparamam of
Visakhapatnam.
The Andhra Pradesh Shilparamam Arts, Crafts & Cultural
Society has invited request for proposals...Read More
|
|
Automobile
|
|
|
Ather Energy plans to set up a new manufacturing unit in South India.
Ather Energy plans to set up a new manufacturing unit in South
India.
July 2019: The company was talking to governments of...Read More
|
|
Drainage
|
|
|
Implementation of storm water drainage scheme in Nellore district of Andhra Pradesh
Implementation of storm water drainage scheme in Nellore district of Andhra
Pradesh
May 2019 : Work on project is under-process and scheduled...Read More
|
|
Implementation of Under Ground Sewerage Schemes (UGSS) for Tindivanam Municipality.
implementation of Under Ground Sewerage Schemes (UGSS) for Tindivanam
Municipality.
The Tamil Nadu Water Supply & Drainage Board has invited
bids for providing...Read More
|
|
Pipe Line
|
|
|
Numaligarh Refinery is planning 1,398 KM crude oil pipeline from Paradip to Numaligarh.
Numaligarh Refinery is planning 1,398 KM crude oil pipeline from Paradip to
Numaligarh.
Apr 2020: Union cabinet has cleared 1,398 KM Crude...Read More
|
|
Construction of India-Bangladesh oil pipeline.
Construction of India-Bangladesh oil pipeline.
Prime Minister may flag
off the construction of the 136-km pipeline to carry diesel from Siliguri
in West...Read More
|
|
Construction of product pipeline 654km from Numaligarh to the marketing terminal at Siliguri, West Bengal.
Construction of product pipeline with capacity of 6Mtpa and stretch 654 km
from Numaligarh to the marketing terminal at Siliguri, West...Read More
|
|
WHR/Cogeneration
|
|
|
Anindita Steels plans to set up a WHR & FBC based CPP in Hazaribagh
Anindita Steels plans to set up a WHR & FBC based CPP in Hazaribagh,
Jharkhand.
Jan.2015:Project is still in planning state.
Oct 2015:
Land...Read More
|
|
Malbros International unit-II plans to set up an co-gen power project at Village Mansoorwala
Malbros International unit-II plans to set up an co-gen power project at
Village Mansoorwala.
The project capacity 2x20 MW coal/ rice husk/pet
coke/...Read More
|
|
Electronic Products
|
|
|
HP is setting up a new facility in Chennai, Tamil Nadu.
HP along with electronics manufacturer Flex, is setting up a new facility
in Chennai, Tamil Nadu....Read More
|
|
Auto Ancillaries
|
|
|
Craftsman Automation (P) Ltd., plans to set up Automobile Components unit in Erode
Craftsman Automation (P) Ltd., plans to set up Automobile Components unit
in Erode
Aug 2013:- The project kept on hold, some reasons.
July...Read More
|
|
Cement
|
|
|
Duratech Cements India plans to set up an portland cement, hydraulic cement, clinker in Hoshiarpur
Duratech Cements India Ltd. plans to set up an portland cement, portland bp
ozzolana cement and similar hydraulic cement except in...Read More
|
|
Machine Tools
|
|
|
Brindley Technologies plans to set up computer terminals like ATM, POS terminals in Greater Mumbai
Brindley Technologies plans to set up computer terminals like automatic
teller machines ATM , point of sale pos terminals not mechanically...Read More
|
|
Petrochemical
|
|
|
Andhra Pradesh Indl. Infrastructure Corpn plans to set up PCPIR Project at Visakhapatnam- Kakinada.
Andhra Pradesh Indl. Infrastructure Corpn. Ltd., plans to set up PCPIR
Project at Visakhapatnam - Kakinada.
The Petroleum, Chemicals and
Petrochemical Investment...Read More
|
|
Dyes & Pigments
|
|
|
Kunder Chemical plans to set up an organic pigments at GIDC, Vapi in Valsad district of Gujarat.
Kunder Chemical plans to set up an organic pigments at GIDC, Vapi in Valsad
district of Gujarat.
June 2018 : Work on...Read More
|
|
Supreme Dyechem plans to set up an pigments at Pachayakuppam in Cuddalore
Supreme Dyechem plans to set up an pigments at Pachayakuppam in Cuddalore
district of Tamil Nadu.
June 2019 : Project is still...Read More
|
|
Paints & Varnishes
|
|
|
Maple Panels plans to set up resin manufacturing unit in Gandhidham.
Maple Panels plans to set up resin manufacturing unit in Gandhidham.
Mar
2017 : Land is acquired, paper work is in progress,...Read More
|
|
Basic Chemical
|
|
|
Stork Ferro & Mineral Industries plans to set up Titanium Slag unit in Balasore
Stork Ferro & Mineral Industries plans to set up Titanium Slag unit in
Balasore.
Aug 2013 :The Work on project is...Read More
|
|
Plastic
|
|
|
Bhagavathi Toolings plans to set up an tool room & plastic components moulding unit in Dabaspet
Bhagavathi Toolings plans to set up an tool room & plastic components
moulding unit (for medical devices) in Dabaspet, dist. Bangalore
July
2015...Read More
|
|
Simplast India plans to set up a rotational molded plastic article in Cheyyar, Tiruvannamalai
Simplast India plans to set up a rotational molded plastic article mfg unit
in Cheyyar, dist. Tiruvannamalai, Tamil Nadu
Aug 2016 :...Read More
|
|
Agro Chemicals
|
|
|
Assam Petrochemicals Ltd is planning to set up Methanol Project at Namrup.
Assam Petrochemicals Ltd is planning to set up Methanol Project at
Namrup.
Oct 2013 :The integrated Methanol Acetic Acid Plants has been
envisaged...Read More
|
|
Distillary/Alcohol
|
|
|
Dnyanyogi Shri Shivakumar Swamiji Sugars plans to set up molasses based distillery unit in Bijapur
Dnyanyogi Shri Shivakumar Swamiji Sugars plans to 60 KLD molasses based
distillery (to produce rectified spirit) unit in Hirebevanur.
Jan.2016 :
Environment Clearance...Read More
|
|
Ganpati Sugar Industries plans to set up an 30 KLD molasses-based distillery in Chowtkur dist. Medak
Ganpati Sugar Industries plans to set up an 30 KLD molasses-based
distillery in Chowtkur dist. Medak
Feb 2016 : Land is acquired...Read More
|
|
Malbros International unit-II plans to set up grain-based distillery & co-gen power at Mansoorwala
Malbros International unit-II plans to set up an grain-based distillery &
co-gen power project at Village Mansoorwala
Feb 2016 : Awaiting...Read More
|
|
Chemical derivatives
|
|
|
Meridian Chem-Bond plans to set up an synthetic organic chemicals mfg unit at GIDC Saykha
Meridian Chem-Bond plans to set up an 15,318 TPM synthetic organic
chemicals mfg unit at GIDC Saykha, dist. Bharuch
Feb 2017 :...Read More
|
|
Metro Rail
|
|
|
Pune metro railway project.
The Pune Municipal Corporation (PMC) has decided to develop Pune metro
railway project on public-private partnership model at a cost of...Read More
|
|
Kochi Metro Rail project Phase II
There are currently proposals to extend the metro to Thrikkakara, Kakkanad,
Angamaly, Nedumbassery and west Kochi region, including Vypeen
islands.
On 11 September...Read More
|
|
Lucknow metro rail project.
The proposed metro rail network was planned to consist of two corridors:
North-South and East-West one from Amausi to Munshi Pulia...Read More
|
|
Chennai Metro plans for extension of Corridor-I.
The extension will take Corridor-I of the Metro Rail (Chennai
Airport-Washermenpet) a further nine km. Seven new Metro stations would
come up...Read More
|
|
MMRDA plans to develop Wadala-Thane-Kasarvadavali Metro rail project Metro-4.
MMRDA plans to develop Wadala-Thane-Kasarvadavali Metro rail
project.
Project will be implemented by the Mumbai Metro Rail
Corporation (MMRC)
The 32-km long WGTK corridor...Read More
|
|
Amaravati (Vijayawada) Metro Rail.
CRDA plans for Vijayawada Metro Rail.
The DMRC has prepared the design
for a 26-km stretch covering both Bandar and Eluru Roads,...Read More
|
|
Jaipur Metro Phase-II, stretching 24 km between Ambabari and Sitapura.
Jaipur Metro Phase-II, stretching 24 km between Ambabari and
Sitapura.
JMRC has received tenders from four international firms to
review the detailed project...Read More
|
|
The extension of Metro 4 from Kasarvadavali in Thane till Gaimukh.
The extension of Metro 4 from Kasarvadavali in Thane till Gaimukh.
The
Metro 4A corridor will have two stations--Gowniwadi and Gaimukh....Read More
|
|
Transmission Line
|
|
|
Construction of 77.31 km transmission line from the new 230 kV substation at Neyveli to Kadalangudy.
Construction of 77.31 km transmission line from the new 230 kV substation
at Neyveli to Kadalangudy.
The 77.31 km transmission line from...Read More
|
|
Runway & Terminal
|
|
|
Airport Authority of Indian is to construct Green Field Airport at Holongi, Itanagar, : Bid invited
The Airport Authority of Indian is to construct Green Field Airport at
Holongi, Itanagar, Arunachal Pradesh.
Mar 2019: The Airports Authority
of India...Read More
|
|
Bangalore International Airport expansion Terminal 2.
The project envisages construction of a new terminal along with the second
runway, taxiways, aprons, aircraft parking and all aviation facilities...Read More
|
|
Township
|
|
|
Arihant Superstructures develop a residential complex 'Arihant Anaika' at Navi Mumbai
Arihant Superstructures develop a residential complex 'Arihant Anaika' at
Navi Mumbai
April 2016 : Project is under-construction and scheduled to
be completed...Read More
|
|
Construct the 'Purva Silversands' theme based Integrated Lifestyle at Mundhwa
Provident Housing, a wholly owned subsidiary of Puravankara
Group, plans
to construct the 'Purva Silversands' theme
based Integrated Lifestyle
District at Mundhwa, dist. Pune
Jan...Read More
|
|
Empire Industries is implementing an industrial township ¡¦Empire Industrial Centrum¡¦ at Chikhloli
Empire Industries is implementing an industrial township
Empire Industrial
Centrum at Chikhloli village, Ambernath
(West) in Thane
May 2017 :
Project is under-construction and scheduled...Read More
|
|
Construction of 'Nyay Gram', a model township of High Court in Allahabad.
Construction of 'Nyay Gram', a model township of High Court in
Allahabad.
The Uttar Pradesh government has provided 34.82 acre at
Devghat, Jhalwa,...Read More
|
|
Construction of township for NMDC at Niyanar in Jagdalpur.
Construction of township over 118.00 acre for NMDC at Niyanar in
Jagdalpur.
The Chhattisgarh Housing Board has floated tender for project
management consultancy...Read More
|
|
Solid Waste recyling
|
|
|
Satarem Ent plans to set up a integrated municipal SWM facility & a solid waste-based IPP
The project envisages a 1000 TPD integrated municipal
solid waste
management facility and a 2x14.5 MW municipal solid waste-based IPP at
Goruru Village,...Read More
|
|
A/C & Refrigeration
|
|
|
IFB Industries plans to set up an air conditioners mfg unit in goa
IFB Industries plans to set up an air conditioners in South Goa.
IFB
Industries is engaged in the business of manufacturing and...Read More
|
|
Elevator
|
|
|
Sematic Elevator Products India Pvt. Ltd., plans to set up elevator products in Satara
Sematic Elevator Products India Pvt. Ltd., plans to set up elevator
products in Satara
Feb 2015 : Work on project is in...Read More
|
|
Sugar
|
|
|
Mohatadevi Sugar Mills & Agro is setting up a white crystal sugar unit
Mohatadevi Sugar Mills & Agro is setting up a white crystal sugar unit with
a capacity of 2,500 tccpd at Matori...Read More
|
|
Krishnakath Foods plans to set up a jaggery manufacturing project at Palus
Krishnakath Agro Process, group company of Krishnakath Foods, is planning a
jaggery manufacturing project at Palus, dist.
Sangli
Feb 2015: The
work on project...Read More
|
|
Krishnakath Foods plans to set up a sugar manufacturing project at Palus
Krishnakath Agro Process, group company of Krishnakath Foods, is planning
an expansion of its sugar manufacturing project at Palus,
dist.
Sangli
July 2015 :...Read More
|
|
HB Sugar Industries plans to aset up an sugar manufacturing & bagasse-based co-gen power in Jaunpur
HB Sugar Industries, group company of Super Construction Company, is
planning a 3,500 TCD sugar manufacturing project and a 20 MW...Read More
|
|
Krishnakath Agro Process plans to set up an boors & candy from sugarcane unit in Sangli
Krishnakath Agro Process Ltd. plans to set up an boors and candy(khadi
shakkar) from sugarcane unit in Sangli
July 2015 : Land...Read More
|
|
Dnyanyogi Shri Shivakumar Swamiji Sugars plans to expand Sugar Cane Crushing unit in Karnataka.
Dnyanyogi Shri Shivakumar Swamiji Sugars plans to expand Sugar Cane
Crushing unit (1750 TCD to 5000 TCD) in bijapur,Karnataka.
Current
Status : Environment...Read More
|
|
Animal Feed
|
|
|
Kerala Feeds plans to set up an cattle feed production unit in Thodupuzha
Kerala Feeds plans to set up an 500 TPD cattle feed production unit in
Thodupuzha, dist. Idukki, Kerala.
Jan.2015: Construction work on...Read More
|
|
Lift Irrigation
|
|
|
Implementation of Chintalapudi Lift Irrigation Scheme.
Implementation of Chintalapudi Lift Irrigation Scheme.
Nov 2018 : As
of Oct Gayatri projects has been awarded for the project.
Aug 2019:...Read More
|
|
Silk
|
|
|
Aqua Fiber Industries plans to set up polyester staple fiber based on recycled pet in Derabassi
Aqua Fiber Industries plans to set up polyester staple fiber based on
recycled pet in Derabassi, Sasnagar.
May 2019 ; Work on...Read More
|
|
Refinery
|
|
|
CPCL plans to set up a refinery Cauvery Basin, Nagapattinam in Tamil Nadu.
CPCL plans to set up a refinery Cauvery Basin, Nagapattinam in Tamil
Nadu.
The final approval of the project will...Read More
|
|
Numaligarh Refinery plans to set up Bio-refinery.
Numaligarh Refinery plans to set up Biorefinery.
Chempolis Ltd., a
Finland based bio refining technology corporation has inked partnership
agreement with Numaligarh Refinery...Read More
|
|
Government
|
|
|
Development of CC Road, B.T Road and Drains at Belura Village Under Chulakinala Project
Development of CC Road, B.T Road and Drains at Belura Village Under
Chulakinala Project....Read More
|
|
Improvements to Roads-MRL20-Bettadamane Devarunda road MDR to Kirugunda via Kajjehalli in Mudigere taluk of Chickmagalur District.
Improvements to Roads-MRL20-Bettadamane Devarunda road MDR to Kirugunda via
Kajjehalli in Mudigere taluk of Chickmagalur District (Package No
:KN-09-16),...Read More
|
|
Construction of Barrage Cum Bridge across Kumadvati River Near Masur, Hiremoraba, Rattihalli and Barrage at Hiremadapur Villages in Hirekerur Taluk, Haveri District.
Construction of Barrage Cum Bridge across Kumadvati River Near Masur,
Hiremoraba, Rattihalli and Barrage at Hiremadapur Villages in Hirekerur
Taluk, Haveri District....Read More
|
|
Exploration & Prod
|
|
|
Rel to explore gas in KG-D6 block.
Project activities:
The size of KG-DG’s reserves, well pressure, and
overall complexity made this one of world’s toughest hydrocarbons
projects. Bechtel managed...Read More
|
|
Coal / Coke
|
|
|
Fuelco Washeries India Ltd is setting up Coal Washery Project at Belsani-Shengaon
Fuelco Washeries India Ltd is setting up Coal Washery Project at
Belsani-Shengaon in chandrapur dist.
July 2014: Work on project is in
progress.
Feb...Read More
|
|
Fuelco Washeries India Ltd is setting up Coal Washery Project at Deulwada
Fuelco Washeries India Ltd is setting up Coal Washery Project at Deulwada
in nagpur dist.
July 2014:Work on project is in progress...Read More
|
|
Mastek Steels has put on hold a coal-based CPP unit in Bellary, Karnataka
Mastek Steels has put on hold a coal-based CPP in Bellary,
Karnataka.
Dec. 2015 : Work on project is still kept on...Read More
|
|
Development of the Naini coal block in Odisha.
Development of the Naini coal block in Odisha.
Company will soon float
tenders for mine development operator.
July 2019: SCCL has initiated
steps to...Read More
|
|
Development and operation of Talabira-II and III coal block.
Development and operation of Talabira-II and III coal block.
The block
is located in IB valley coalfields in Sambalpur and Jharsuguda in...Read More
|
|
Generation
|
|
|
Jeypore Sugar Co. plans to set up power plant (cogeneration) unit in Chagallu
Jeypore Sugar Co. plans to set up power plant (cogeneration) unit in
Chagallu
Mar 2015 : Work on project is still planning...Read More
|
|
Conventional
|
|
|
Namrup Replacement Thermal Power Plant (NRPP) at Namrup in Dibrugarh.
Namrup Replacement Thermal Power Plant (NRPP) at Namrup in
Dibrugarh.
The Assam Power Generation Corporation (APGCL) will
commission the Namrup Replacement Thermal Power...Read More
|
|
Electricity
|
|
|
Mpl Mineral Processing plans to set up an electrical Power unit in Mandal Kodumur
Mpl Mineral Processing Pvt. Ltd. plans to set up an electrical Power unit
in Kurnool
June 2016 : Financial closure is in...Read More
|
|
Krishanakanth Agro Process plans to set up steam for captive use & electricity export unit in Sangli
Krishanakanth Agro Process Ltd plans to set up steam for captive use and
electricity for captive export unit in Sangli
Mar 2015...Read More
|
|
TNDCL plans to set up an udangudi super critical thermal power project in Thoothukudi
Tamilnadu Generation And Distribution Corporation Limited plans to set up
an udangudi super critical thermal power project in Thoothukudi
The
capacity of this...Read More
|
|
Distribution
|
|
|
Shirdi Sai Electricals plans to set up an distribution transformers in Andhra Pradesh
Shirdi Sai Electricals Ltd. plans to set up an distribution transformers in
Andhra Pradesh.
The unit will come up over 35 acre...Read More
|
|
Mining
|
|
|
The A.P Mineral Develop Corp plans to set up an Ragimanipenta black granite deposit mining project
The A.P Mineral Development Corporation plans to set up an Ragimanipenta
black granite deposit mining project at Village Ragimanipenta, dist.
Chittoor, Andhra...Read More
|
|
Implementation of tubed coal mine project.
Implementation of tubed coal mine project.
The coal linkage of the
project is proposed for MTPS Units-7 and 8 and CTPS Unit-8.
The...Read More
|
|
Mining
|
|
|
The A.P Mineral Develop Corp plans to set up an Ragimanipenta black granite deposit mining project
The A.P Mineral Development Corporation plans to set up an Ragimanipenta
black granite deposit mining project at Village Ragimanipenta, dist.
Chittoor, Andhra...Read More
|
|
Implementation of tubed coal mine project.
Implementation of tubed coal mine project.
The coal linkage of the
project is proposed for MTPS Units-7 and 8 and CTPS Unit-8.
The...Read More
|
|
Station
|
|
|
Redevelopment of New Delhi railway station.
The Northern Railways has taken up the New Delhi railway station
modernisation project with an investment of Rs. 12,000-crore.
The
companies in race...Read More
|
|
Rail-road
|
|
|
Railway line between Akanapet and Medak.
Railway line between Akanapet and Medak
Nov 2019 : Work on project is
under-construction.
May 2020 : Work on project is...Read More
|
|
Doubling of Bhatni-Aunrihar section in Uttar Pradesh.
Doubling of Bhatni-Aunrihar section in Uttar Pradesh.
The Rail Vikas
Nigam (RVNL) has floated tender for supply of ballast, track installation
and linking...Read More
|
|
Repair and Maintenance of End of Kamakhyanagar Bypass to Duburi section of Odisha
Repair and Maintenance of End of Kamakhyanagar Bypass to Duburi section of
NH 200 from Km.336.900 to Km.388.000 in the State...Read More
|
|
Construction of 135 km double line from Gevra Road to Pendra Road in Chhattisgarh.
Construction of 135 km double line from Gevra Road to Pendra Road in
Chhattisgarh.
A loan agreement has been signed between Chhattisgarh...Read More
|
|
Road/Highway
|
|
|
Two lanning of Chas-Ramgarh section of NH-23 : RFQ invited
The project envisages two laning with paved shoulders of Chas-Ramgarh
section of NH-23 from km 0.000 to km 78.192 under NHDP-IV...Read More
|
|
Rehabilitation and upgradation of NH-111 from Katghora to Shivnagar section.
The Ministry of Road Transport & Highways through Chhattisgarh PWD plans
for rehabilitation and upgradation of NH-111 from Katghora to Shivnagar
section.
Oct...Read More
|
|
Construction of the 47 km Ring Road project, connecting Ajmer Road to Agra Road.
Construction of the 47 km Ring Road project, connecting Ajmer Road to Agra
Road.
The Rajasthan government will cancel the joint venture...Read More
|
|
Widening and reconstruction of Barghat-Kanhiwada Road.
Widening and reconstruction of Barghat-Kanhiwada Road,
Dharna-Asta-Dondiwada-Dharmakua Road, Waraseoni-Katangi Road.
IL&FS
Transportation Networks and IL&FS Engineering and Construction Company
joint venture has emerged as...Read More
|
|
Four laning of Tuljapur-Ausa (including Tuljapur bypass) section of NH-361.
Four laning of Tuljapur-Ausa (including Tuljapur bypass) section of
NH-361.
NHAI has declared Dilip Buildcon as the successful bidder (L-1)
for four laning...Read More
|
|
Widening and reconstruction of Ganj-Rajnagar road (MP-MDR-35- 02).
Widening and reconstruction of Ganj-Rajnagar road (MP-MDR-35- 02).
IL&FS
Transportation Networks and IL&FS Engineering and Construction joint
venture (51:49) has emerged as the...Read More
|
|
Widening and reconstruction of Laundi -Mahoba road (MP-MDR- 35-11).
Widening and reconstruction of Laundi -Mahoba road (MP-MDR-
35-11).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as...Read More
|
|
Widening and reconstruction of Nawgong-Shrinagar road (MP-MDR-35-04).
Widening and reconstruction of Nawgong-Shrinagar road
(MP-MDR-35-04).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as the lowest...Read More
|
|
Widening and reconstruction of Baxwaha-Dalpatpur road (MP-MDR-35-18).
Widening and reconstruction of Baxwaha-Dalpatpur road
(MP-MDR-35-18).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as the lowest...Read More
|
|
Two-laning with paved shoulder of Meensurutti (98.433 km) to Chidambaram (129.965 km) of NH-227
Two-laning with paved shoulder of Meensurutti (98.433 km) to Chidambaram
(129.965 km) section of NH-227.
KNR Constructions has bagged two-laning
with paved shoulder...Read More
|
|
NHAI plans for construction of Rewari bypass.
NHAI plans for construction of Rewari bypass.
NHAI has initiated the
process for acquisition of land for construction of Rewari bypass.
Land
in Davana,...Read More
|
|
Construction of (Karvad to Jujuwa Section) under (Phase-I Package-IX) on Vadodara-Mumbai Expressway
Construction of (Karvad to Jujuwa Section) under (Phase-I Package-IX) on
Vadodara-Mumbai Expressway.
NHAI has floated tenders for construction
works from 128.000 km to...Read More
|
|
Strategic Road Development Plan (SRDP) for Hyderabad.
Strategic Road Development Plan (SRDP) for Hyderabad.
Project components
under Phase-I are divided into five packages, and include road development,
junction improvement, and...Read More
|
|
Widening, strengthening of section from Bharthana Chowk to Kodarkoot Road.
Widening, strengthening of section from Bharthana Chowk to Kodarkoot
Road.
Public Works Department, Uttar Pradesh has floated tender for
widening, strengthening of section...Read More
|
|
Construction of box culvert at Ch 5.34 km in MRL-04 NH Near Heggeri to MDR Tadkod-Garag via Belur in Dharwad Taluk of Dharwad District (Package No :KN-13-06)
Improvements to Road-MRL04-NH Near Heggeri to MDR Tadkod-Garag via
Belur-kotur-Singanahalli- Bogur-Dubbanamaradi to Construction of Long span
bridge-Construction of box culvert at Ch...Read More
|
|
Improvements to Road MRL10-Chapagaon-Jalaga To Karambal in Khanapur taluk Belgaum District.
Improvements to Road MRL10-Chapagaon-Jalaga To Karambal in Khanapur taluk
Belgaum District of Tender Package No. KN-04-10....Read More
|
|
Improvements to Road MRL17-Hattargunji-Mudewadi-Dukarwadi To SH and Road from MRL16-Katagali-Modekoppa To SH-31 in Khanapur taluk Belgaum District .
Improvements to Road MRL17-Hattargunji-Mudewadi-Dukarwadi To SH and Road
from MRL16-Katagali-Modekoppa To SH-31 in Khanapur taluk Belgaum District
of Tender Package No. KN-04-09....Read More
|
|
Improvements to Road MRL22-Hangaraga to Kallehol and Road from MRL35-Muchandi-Budyanur to Karavi in Belgaumt aluk Belgaum.
Improvements to Road MRL22-Hangaraga to Kallehol and Road from
MRL35-Muchandi-Budyanur to Karavi in Belgaumt aluk Belgaum District of
Tender Package No. KN-04-04....Read More
|
|
Improvements to Road-MRL10-Shiraguppi to Kallal via Shedbal Wadder vasti to MRL17-Awarkhod to MDR via Radderhatti Karl tota to , in Athani Taluk of Belgaum
Improvements to Road-MRL10-Shiraguppi to Kallal via Shedbal Wadder vasti to
MRL17-Awarkhod to MDR via Radderhatti Karl tota to , in Athani...Read More
|
|
Improvements to Roads-MRL01-Adargunchi to kundagol taluk border via Noolvi MRL07-NH near Varur to NH-4 near Agadi via Aralikatti in Hubli taluk of Dharwad District
Improvements to Roads-MRL01-Adargunchi to kundagol taluk border via Noolvi
MRL07-NH near Varur to NH-4 near Agadi via Aralikatti in Hubli taluk...Read More
|
|
Widening and improving the road to Multilane branching from Thindal Junction
Widening and improving the road to Multilane branching from Thindal
Junction at Km 72 of Erode Perundurai Kangeyam road SH 96...Read More
|
|
Improvements,Performance based Maintenance Contract for 60 months in SH and MDR for 371.447 Km in Kumbakonam, Thiruvidaimaruthur, Papanasam.
Widening, Strengthening, Improvements,Performance based Maintenance
Contract for 60 months in SH and MDR for 371.447 Km in Kumbakonam,
Thiruvidaimaruthur, Papanasam and Thiruvidaimaruthur...Read More
|
|
Road upgradation of Goha-Khellani section on NH-244.
Road upgradation of Goha-Khellani section on NH-244.
The government of
India, Ministry of Road Transport & Highways (MoRTH), has invited bids for
upgradation...Read More
|
|
Road/Highway
|
|
|
Two lanning of Chas-Ramgarh section of NH-23 : RFQ invited
The project envisages two laning with paved shoulders of Chas-Ramgarh
section of NH-23 from km 0.000 to km 78.192 under NHDP-IV...Read More
|
|
Rehabilitation and upgradation of NH-111 from Katghora to Shivnagar section.
The Ministry of Road Transport & Highways through Chhattisgarh PWD plans
for rehabilitation and upgradation of NH-111 from Katghora to Shivnagar
section.
Oct...Read More
|
|
Construction of the 47 km Ring Road project, connecting Ajmer Road to Agra Road.
Construction of the 47 km Ring Road project, connecting Ajmer Road to Agra
Road.
The Rajasthan government will cancel the joint venture...Read More
|
|
Widening and reconstruction of Barghat-Kanhiwada Road.
Widening and reconstruction of Barghat-Kanhiwada Road,
Dharna-Asta-Dondiwada-Dharmakua Road, Waraseoni-Katangi Road.
IL&FS
Transportation Networks and IL&FS Engineering and Construction Company
joint venture has emerged as...Read More
|
|
Four laning of Tuljapur-Ausa (including Tuljapur bypass) section of NH-361.
Four laning of Tuljapur-Ausa (including Tuljapur bypass) section of
NH-361.
NHAI has declared Dilip Buildcon as the successful bidder (L-1)
for four laning...Read More
|
|
Widening and reconstruction of Ganj-Rajnagar road (MP-MDR-35- 02).
Widening and reconstruction of Ganj-Rajnagar road (MP-MDR-35- 02).
IL&FS
Transportation Networks and IL&FS Engineering and Construction joint
venture (51:49) has emerged as the...Read More
|
|
Widening and reconstruction of Laundi -Mahoba road (MP-MDR- 35-11).
Widening and reconstruction of Laundi -Mahoba road (MP-MDR-
35-11).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as...Read More
|
|
Widening and reconstruction of Nawgong-Shrinagar road (MP-MDR-35-04).
Widening and reconstruction of Nawgong-Shrinagar road
(MP-MDR-35-04).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as the lowest...Read More
|
|
Widening and reconstruction of Baxwaha-Dalpatpur road (MP-MDR-35-18).
Widening and reconstruction of Baxwaha-Dalpatpur road
(MP-MDR-35-18).
IL&FS Transportation Networks and IL&FS Engineering and
Construction joint venture (51:49) has emerged as the lowest...Read More
|
|
Two-laning with paved shoulder of Meensurutti (98.433 km) to Chidambaram (129.965 km) of NH-227
Two-laning with paved shoulder of Meensurutti (98.433 km) to Chidambaram
(129.965 km) section of NH-227.
KNR Constructions has bagged two-laning
with paved shoulder...Read More
|
|
NHAI plans for construction of Rewari bypass.
NHAI plans for construction of Rewari bypass.
NHAI has initiated the
process for acquisition of land for construction of Rewari bypass.
Land
in Davana,...Read More
|
|
Construction of (Karvad to Jujuwa Section) under (Phase-I Package-IX) on Vadodara-Mumbai Expressway
Construction of (Karvad to Jujuwa Section) under (Phase-I Package-IX) on
Vadodara-Mumbai Expressway.
NHAI has floated tenders for construction
works from 128.000 km to...Read More
|
|
Strategic Road Development Plan (SRDP) for Hyderabad.
Strategic Road Development Plan (SRDP) for Hyderabad.
Project components
under Phase-I are divided into five packages, and include road development,
junction improvement, and...Read More
|
|
Widening, strengthening of section from Bharthana Chowk to Kodarkoot Road.
Widening, strengthening of section from Bharthana Chowk to Kodarkoot
Road.
Public Works Department, Uttar Pradesh has floated tender for
widening, strengthening of section...Read More
|
|
Construction of box culvert at Ch 5.34 km in MRL-04 NH Near Heggeri to MDR Tadkod-Garag via Belur in Dharwad Taluk of Dharwad District (Package No :KN-13-06)
Improvements to Road-MRL04-NH Near Heggeri to MDR Tadkod-Garag via
Belur-kotur-Singanahalli- Bogur-Dubbanamaradi to Construction of Long span
bridge-Construction of box culvert at Ch...Read More
|
|
Improvements to Road MRL10-Chapagaon-Jalaga To Karambal in Khanapur taluk Belgaum District.
Improvements to Road MRL10-Chapagaon-Jalaga To Karambal in Khanapur taluk
Belgaum District of Tender Package No. KN-04-10....Read More
|
|
Improvements to Road MRL17-Hattargunji-Mudewadi-Dukarwadi To SH and Road from MRL16-Katagali-Modekoppa To SH-31 in Khanapur taluk Belgaum District .
Improvements to Road MRL17-Hattargunji-Mudewadi-Dukarwadi To SH and Road
from MRL16-Katagali-Modekoppa To SH-31 in Khanapur taluk Belgaum District
of Tender Package No. KN-04-09....Read More
|
|
Improvements to Road MRL22-Hangaraga to Kallehol and Road from MRL35-Muchandi-Budyanur to Karavi in Belgaumt aluk Belgaum.
Improvements to Road MRL22-Hangaraga to Kallehol and Road from
MRL35-Muchandi-Budyanur to Karavi in Belgaumt aluk Belgaum District of
Tender Package No. KN-04-04....Read More
|
|
Improvements to Road-MRL10-Shiraguppi to Kallal via Shedbal Wadder vasti to MRL17-Awarkhod to MDR via Radderhatti Karl tota to , in Athani Taluk of Belgaum
Improvements to Road-MRL10-Shiraguppi to Kallal via Shedbal Wadder vasti to
MRL17-Awarkhod to MDR via Radderhatti Karl tota to , in Athani...Read More
|
|
Improvements to Roads-MRL01-Adargunchi to kundagol taluk border via Noolvi MRL07-NH near Varur to NH-4 near Agadi via Aralikatti in Hubli taluk of Dharwad District
Improvements to Roads-MRL01-Adargunchi to kundagol taluk border via Noolvi
MRL07-NH near Varur to NH-4 near Agadi via Aralikatti in Hubli taluk...Read More
|
|
Widening and improving the road to Multilane branching from Thindal Junction
Widening and improving the road to Multilane branching from Thindal
Junction at Km 72 of Erode Perundurai Kangeyam road SH 96...Read More
|
|
Improvements,Performance based Maintenance Contract for 60 months in SH and MDR for 371.447 Km in Kumbakonam, Thiruvidaimaruthur, Papanasam.
Widening, Strengthening, Improvements,Performance based Maintenance
Contract for 60 months in SH and MDR for 371.447 Km in Kumbakonam,
Thiruvidaimaruthur, Papanasam and Thiruvidaimaruthur...Read More
|
|
Road upgradation of Goha-Khellani section on NH-244.
Road upgradation of Goha-Khellani section on NH-244.
The government of
India, Ministry of Road Transport & Highways (MoRTH), has invited bids for
upgradation...Read More
|
|
Bridge
|
|
|
PWD, Kerala plans for construction of a bridge at
PWD, Kerala plans for construction of a bridge at Muthulakurichickal on
Nedumudi - Karuvatta Road
Jan 2019 ; Work on project is...Read More
|
|
Construction of H.L. R.C.C. Bridge in Khurhan-Parail-RatwaraKapasia & AlamnagarBudhma-Mali
Construction of H.L. R.C.C. Bridge in 10th K.m of
Khurhan-Parail-RatwaraKapasia (Extended Part of RCD road 0 to 15 K.m) road
& 5...Read More
|
|
Construction of H.L. R.C.C. Bridge in Belghachhi-(PWD) Via Nitendra-Kalimandir-Machhatta-Geria
Construction of H.L. R.C.C. Bridge in 3rd K.m of Belghachhi-(PWD) Via
Nitendra-Kalimandir-Machhatta-Geria (Section-Palsa to Kalimandir) in the
district of Purnia.
Nov 2019 ;...Read More
|
|
Construction of H.L. R.C.C. Bridge in Udahat-Techni-Khataghat road along Parman river in Araria.
Construction of H.L. R.C.C. Bridge in 16th K.m of Udahat-Techni-Khataghat
road along Parman river in the district of Araria.
[ Katihar]
Nov
2019 ;...Read More
|
|
Reconstruction of a bridge on the Mithi River near Dharavi.
Reconstruction of a bridge on the Mithi River near Dharavi.
The BMC
awarded the contract to RPS Infraproject.
The Bombay high court
cancelled contract...Read More
|
|
Construction of 105 metres steel truss motor bridge & its approach Dholi River at Chal, Pithoragarh
Construction of 105 metres steel truss motor bridge and its approach road
over Dholi River at Chal in Pithoragarh district of...Read More
|
|
Tunnel
|
|
|
Rohtang Tunnel project: Construction to begin
Border Roads Organistaion has planned to develop a 8. 8 km long Rohtang
Tunnel worth Rs. 1,458 crore near Manali...Read More
|
|
Zojila tunnel project in J&K.
Zojila tunnel project in Jammu and Kashmir.
The government ordered
"rebidding" of the strategic Rs 10,050-crore Zojila pass tunnel contract in
Jammu and...Read More
|
|
Rail Over Bridge
|
|
|
Construction of new rail bridge at Elephant Gate.
Construction of new rail bridge at Elephant Gate.
The project is at the
preliminary stage and the government is waiting for a...Read More
|
|
Rope-way / Cable Car
|
|
|
Development of passenger ropeway system in Shimla.
Development of passenger ropeway system in Shimla.
The Ropeways & Rapid
Transport System Development Corporation has invited request for proposal
(RfP) for design,...Read More
|
|
Park
|
|
|
Amusement park (including snow park) in Shilparamam of Visakhapatnam district.
Amusement park (including snow park) in Shilparamam of Visakhapatnam
district.
The Andhra Pradesh Shilparamam Arts, Crafts & Cultural Society
has invited request for...Read More
|
|
Kraft Paper
|
|
|
Samrat Paper Mills plans to set up kraft paper based on waste paper & etc unit in Nashik
Samrat Paper Mills Pvt. Ltd. plans to set up kraft paper based on waste
paper, agricultural and non-conventional raw material...Read More
|
|
Airport
|
|
|
Construction of Greenfield Airport at Mopa in Goa.
Government of Goa plans to construct Greenfield Airport at Mopa through
public private partnership .
Director of PPP Cell invites bids...Read More
|
|
Dholera international airport project.
Dholera SIR is proposed to be developed by the state government as a mega
industrial zone, along the Delhi-Mumbai Industrial Corridor...Read More
|
|
Iron & Steel
|
|
|
POSCO-India steel project in Orissa.
POSCO-India, a subsidiary of POSCO, the world’s fourth largest steel
producer is setting up a 12 MTPA green field steel plant...Read More
|
|
Stork Ferro & Mineral Industries plans to set up Pig Iron unit in Balasore
Stork Ferro & Mineral Industries is expanding Ferro Alloy Plant by
installation of SAF in Balasore
[SAF] (16.5 MVA) for production of...Read More
|
|
Hi Tech Geosynthetics Pvt.Ltd., plans to set up Fabricated Steel Products in Meerut
Hi Tech Geosynthetics Pvt.Ltd., plans to set up Fabricated Steel Products
in Meerut.
Jan.2015 : Work on project is kept on hold...Read More
|
|
Sadhbhawana Impex Pvt. Ltd. plans to set up Tmt rounds unit in Bahraich
Sadhbhawana Impex Pvt. Ltd. plans to set up Tmt rounds unit in
Bahraich.
April 2014 : The work on project is under...Read More
|
|
Construction
|
|
|
Redevelopment of Parliament and three km long Central Vista.
The revamp envisages a new triangular Parliament building that is targeted
to be constructed by August 2022.
Five Indian architecture companies
have evinced...Read More
|
|
Construction of new Prime Minister’s (PM) house, Prime Ministers Office and Parliament
Construction of new Prime Minister’s (PM) house, Prime Ministers Office
and Parliament.
HCP Design and Planning has bagged the contract for
creating the...Read More
|
|
The Andhra Pradesh government plans to set up 11,158 Rythu Bharosa centres.
The Andhra Pradesh government plans to set up 11,158 Rythu Bharosa
centres.
These centres, which will be set up in a phased...Read More
|
|
Construction of multi-storey staff quarters in Delhi.
Construction of multi-storey staff quarters in Delhi.
The National
Capital Region Transport Corporation (NCRTC) has floated tenders for site
development, architectural finishes, E&M,...Read More
|
|
Construction
|
|
|
Redevelopment of Parliament and three km long Central Vista.
The revamp envisages a new triangular Parliament building that is targeted
to be constructed by August 2022.
Five Indian architecture companies
have evinced...Read More
|
|
Construction of new Prime Minister’s (PM) house, Prime Ministers Office and Parliament
Construction of new Prime Minister’s (PM) house, Prime Ministers Office
and Parliament.
HCP Design and Planning has bagged the contract for
creating the...Read More
|
|
The Andhra Pradesh government plans to set up 11,158 Rythu Bharosa centres.
The Andhra Pradesh government plans to set up 11,158 Rythu Bharosa
centres.
These centres, which will be set up in a phased...Read More
|
|
Construction of multi-storey staff quarters in Delhi.
Construction of multi-storey staff quarters in Delhi.
The National
Capital Region Transport Corporation (NCRTC) has floated tenders for site
development, architectural finishes, E&M,...Read More
|
|
Port
|
|
|
Adani Petronet (Dahej) Port plans for multi-cargo port expansion project.
Adani Petronet plans for the third phase expansion of its Dahej port in
Bharuch.
The Centre's green panel has given clearance to...Read More
|
|
Got of A.P Ports, Energy, Infrastructure plans to develop a non major port at BhavanapaduSrikakulam
Government Of Andhra Pradesh, Ports, Energy, Infrastructure
And Investment
Department, plans to develop a non major
port at Village Bhavanapadu,
dist. Srikakulam.
Apr 2020: Adani...Read More
|
|
Apartment
|
|
|
Ekta World is developing a residential complex 'Ekta Parksville' in Virar.
Ekta World is developing a residential complex 'Ekta Parksville' at Virar
(West ) in Thane district of Maharashtra.
The complex comprises 39...Read More
|
|
NCC Urban Infrastructure is building 'NCC Urban Gardenia' at Gachibowli in Hyderabad
NCC Urban Infrastructure is building 'NCC Urban Gardenia' residential
complex project at Gachibowli in Hyderabad district of Andhra Pradesh.
The
project is spread...Read More
|
|
Ahuja Constructions is setting up residential project 'L'Amor'jogeshwari Mumbai.
Ahuja Constructions is setting up residential project 'L'Amor' at
Jogeshwari Mumbai.
The luxury lifestyle project comprises two wings each
of 36 storeys with...Read More
|
|
Puravankara Projects plans for 'Provident Park Squaure' affordable housing project in Bengaluru.
Puravankara Projects plans to develop 'Provident Park Squaure' affordable
housing project at Judicial Layout, Kanakapura road in Bengaluru,
Karnataka.
Project will be a...Read More
|
|
Sobha Ltd. plans for 'Sobha Winchester' project in Chennai.
Sobha Ltd. plans for 'Sobha Winchester' project in
Near Velacherry, 200
ft, Pallavaram-Thuraipakkam Road, Chennai.
Feb.2016: Work on project is
in process.
Architecture is...Read More
|
|
RB&D is constructing the 'Rohan Ab-hilasha',residential project at Wagholi
Rohan Builders And Developers is constructing the 'Rohan Abhilasha', a., 1,
2 & 3 BHK residential project at Wag-holi, dist. Pune,...Read More
|
|
Brigade Group plans to develop ‘Atmosphere’ a new villa project at Devanahalli.
Brigade Group plans to develop ‘Atmosphere’ a new villa project at
Devanahalli near the new Bangalore Airport.
The project called
‘Atmosphere’ is a...Read More
|
|
Mahagun India is developing a residential complex ‘Mahagun Mezzaria’ in Uttar Pradesh.
Mahagun India is developing a residential complex ‘Mahagun Mezzaria’ in
Uttar Pradesh.
The residential complex will spread over 10 acre located
at...Read More
|
|
Development of residential project 'Embassy Edge' in Bengaluru.
Development of residential project 'Embassy Edge' in Bengaluru.
Total
3,000 apartments will be developed in two phases.
Phase-I will have a
total of 826...Read More
|
|
Construction of 576 (144+432) staff quarters at 13th battalion in Gwalior.
Construction of 576 (144+432) staff quarters at 13th battalion in
Gwalior.
Nov 2018 ; Work on project is under construction and scheduled
to...Read More
|
|
Bajaj International Realty is developing a residential complex ‘Bajaj Emerald’ at Andheri (east) in Mumbai, Maharashtra.
Bajaj International Realty is developing a residential complex ‘Bajaj
Emerald’ at Andheri (east) in Mumbai, Maharashtra.
The residential
complex comprises four towers of...Read More
|
|
Construction of Dream Valley Phase-II in Uttar Pradesh.
Construction of Dream Valley Phase-II in Uttar Pradesh.
NBCC (India) has
invited bids for balance works of construction/ rectification of balance
works/ left...Read More
|
|
Construction of Leisure Valley-Verona Height Greater Noida in Gautam Budh Nagar district of Uttar Pradesh.
Construction of Leisure Valley-Verona Height Greater Noida in Gautam Budh
Nagar district of Uttar Pradesh.
NBCC (India) has invited bids for
balance works...Read More
|
|
Construction of residential complex (Phase-II) for AIIMS Raipur in Chhattisgarh.
Construction of residential complex (Phase-II) for AIIMS Raipur in
Chhattisgarh.
HSCC (India) has invited bids for construction of
residential complex (Phase-II) for AIIMS...Read More
|
|
Construction of 700 tenements in Thiruvallur taluka of Thiruvallur.
Construction of 700 tenements in Thiruvallur taluka of Thiruvallur.
The
Tamil Nadu Slum Clearance Board has invited bids for construction of 700
tenements...Read More
|
|
Construction of 920 tenements at Nathamedu Pakkam B village in Thiruvallur district.
Construction of 920 tenements at Nathamedu Pakkam B village in Thiruvallur
district.
The Tamil Nadu Slum Clearance Board has invited bids for
construction...Read More
|
|
Building
|
|
|
Construction of Metro Bhavan at Aarey in Mumbai.
Construction of Metro Bhavan at Aarey in Mumbai.
The Metro Bhavan will
be a centralised control centre for all upcoming Metro corridors...Read More
|
|
Commercial Complex
|
|
|
Construct the ‘Centrade Business Park’ a commercial complex at sector-140, Nodia
Krasa international plans to construct the ‘Centrade Business Park’ a
commercial complex at sector-140, Nodia
The project planned for completion
in 2018.
Oct ...Read More
|
|
Mittal Builders plans to developing a commercial complex ’Mittal One’ at Sewri in Mumbai.
Mittal Builders plans to developing a commercial complex ’Mittal
One’
at Sewri in Mumbai.
Oct 2018 ; Work on project is under planning.
paper...Read More
|
|
I-C-T
|
|
|
Govt. of AP Rs 6000 proposes optical fibre project.
Govt. of AP proposes Rs. 6,000-cr optical fibre project.
Jan 2019: Tera
Software has bagged order worth Rs 324.89 crore for developing...Read More
|
|
Warehouse/Cold store
|
|
|
Metro Cash & Carry India plans to open 50 distribution centers across India by 2020
Metro Cash & Carry India plans to open 50 distribution centers across India
by 2020
Aug 2017 : Project is likely to...Read More
|
|
Education
|
|
|
Construction of Chikkaballapura Institute of Medical Sciences at Chikkamagaluru.
Construction of Chikkaballapura Institute of Medical Sciences at
Chikkamagaluru (Chikkaballapura) district.
The Health & Family Welfare
Department, Karnataka, has floated tenders for construction...Read More
|