Search Tips

Extension of Metro 4 from Kasarvadavali in Thane till Gaimukh.

This Project Viewed 330 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: July 31 2025
  • Cost: Rs 14,549 crore.

Location of the project

  • CityMumbai Suburban
  • StateMaharashtra
  • CountryIndia

Project Details

  • Extension of Metro 4 from Kasarvadavali in Thane till Gaimukh. The Metro 4A corridor will have two stations--Gowniwadi and Gaimukh. The extension of 2.68 km will ensure that the entire Ghodbunder Road is connected by the Metro corridor till Gaimukh. Mar 2019: The Mumbai Metropolitan Region Development Authority (MMRDA) has floated tender for design and construction of elevated viaduct from ch 31,872.088 mtr to ch 34,752.26 mtr and two elevated stations Gowanivada and Gaimukh (excluding architectural finishing and pre-engineered steel roof structure of stations) of line-4A as Metro line-4 extension (Kasarvadavali-Gaimukh). May 2019 : Work on project will begin this year and are expected to go for trial runs by April 2024 March 2020 : Work on project is under-process. Metro construction work has been suspended except the critical works, due to Corona virus pandemic. Apr 2020: MMRDA has invited bids for signalling and train control for extension Corridor (Wadala-Kasarvadavali-Gaimukh) of Mumbai Metro Rail Project. Sept 2020 : Work on project is under -construction, and expected to be completed in 2022. March 2021:Project is under -construction, and expected to be completed in next year . Apr 2021: Alstom Transport India has emerged as the lowest bidder for the supply of signalling and train control devices including the Platform Screen Doors system… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares