Search Tips

Kochi Metro Rail project Phase II

This Project Viewed 182 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: November 13 2026
  • Cost: ₹3,800 crores

Location of the project

  • CityKochi
  • StateKerala
  • CountryIndia

Project Details

  • There are currently proposals to extend the metro to Thrikkakara, Kakkanad, Angamaly, Nedumbassery and west Kochi region, including Vypeen islands. On 11 September 2012, KMRL gave its in-principle nod for the second phase of the proposed Kochi Metro project, which will have to be ratified by the state government. The Rail board has also asked the state government to revisit the total area that the project will cover, so that the project can be extended to the fast developing suburbs of Kochi. In July 2013: Rail India Technical and Economic Service (RITES), to carry out a detailed feasibility study for the Kochi Metro Rail Project, Phase-II. The current plan for Phase II is to extend the metro: - Extension from Aluva to Angamaly via the Cochin International Airport at Nedumbassery - Branch line from Palarivattom to Infopark via Kakkanad. July 2014: Kochi Metro Rail Limited (KMRL) has sought funds from Agence Franaise developpement (AFD), the French development agency, to fund the metro's phase two extensions to Angamaly, Kakkanad and Fort Kochi. A draft detailed project report (DPR) of the extensions is ready. Sept 2014: The detailed project report (DPR) of the Kochi metro rail Phase-II is in final stages and would be submitted shortly. Jan 2015: The Ernakulam District Cooperative Bank will advance Rs. 470 crore as loan to Kochi Metro Rail Ltd. The loan amount will mainly be used for land acquisition for Kochi Metro. July 2016: DMRC has invited fresh tenders for the civil works on two stretches and a bridge in the second phase of the Kochi Metro Rail construction. The stretches are from Maharaja's College to Ernakulam South and from Vyttila Kunnara Park to Pettah. Aug 2016: AFD, has announced its commitment to finance the second phase of Kochi Metro from Jawaharlal Nehru stadium near Palarivattom to Infopark near Kakkanad July 2018 : The Kerala government has sanctioned its approval for revised detailed project report (DPR) on Phase-II extension of the Kochi Metro rail project. The total budget for Phase-II is expected to be Rs 2,310 crore Apr 2019 ; As of Feb ; The Central government has provide approval approval for Kochi Metro’s Phase-II extension to Kakkanad. The proposal for expansion will require clearance from the Public Investment Board (PIB) and later by the Union Cabinet. The Kochi Metro Rail (KMRL) is set to commence land acquisition. Detailed survey are expected to be conducted before June 2019 The ground-level land acquisition will begin from June 2019. The France based AFD has committed Rs 1,300 crore soft loan for the Metro’s Kakkanad extension. Nov 2019 ; Work on project is under planning process. project is approved. •Viaduct and 6 Station Buildings from Kalamassery to JLN Stadium – Larson & Toubro, Chennai •Viaduct and 5 Station Buildings from JLN Stadium to Ernakulam Junction Station – Soma Enterprises Limited, Pune •Viaduct and 5 Station Buildings from Ernakulam Junction to Petta – Era & Ranken (JV), New Delhi May 2020 ; In Mar ; The second phase of the Kochi Metro Rail project from Jawaharlal Nehru International Stadium, Kaloor, to Kakkanad, is yet to get the Centre’s sanction. The Centre should accord it all necessary clearance, including the nod from Public Investment Board Nov 2020 ; fast-track proceedings for acquiring land for the Kochi Metro’s extension to Kakkanad. May 2021: Bidding for construction is yet to begin. Central government’s approval is pending.This phase’s detailed project report (DPR) is currently awaiting the central government’s approval and will likely be funded by the Agence Française de Développement (AFD). Nov 2021; PMC appointment will likely be on a quality and cost-based selection basis with a two-stage adopted for evaluating proposals. i.e., technical & financial Eight firms had submitted tenders for Kochi Metro Phase-2 Project. May 2022 : Kochi metro completes DPR of the 11.2 km project is still in under implementation stage. Sept 2022: Prime Minister has launched the Kochi Metro Phase 2 project entailing an investment of ₹3,800 crores. The Union Cabinet approved the second phase of the Kochi Metro Rail project, which will have 11 stations covering a length of over 11 km. Mar 2023 : Starting the work on Kochi Metro Phase II, connecting city centre to Infopark at Kakkanad, the Kochi Metro Rail Ltd (KMRL) has begun detailed preparatory works, including geotechnical survey, for the construction of the new Metro line from JLN Stadium to Kakkanad. The works including soil testing began on the Palarivattom-Kakkanad stretch and the official procedure to acquire land for nine Metro stations has also commenced. SYSTRA S.A. – SYSTRA MVA Consulting (India) Pvt. Ltd. JV recently emerged as the preferred & lowest bidder for Kochi Metro Phase 2’s General Consultant (GC) contract. Apr 2023: 3 firms have submitted bids for the Detailed Design Consultant (DDC) contract of Kochi Metro Phase 2‘s electrification system after Kochi Metro Rail Ltd (KMRL) Lead Bidders Ardanuy India Pvt. Ltd. Leap Infraasys Pvt. Ltd. SYSTRA MVA Consulting India Pvt. Ltd. Egis Rail was recently declared as the lowest bidder for Kochi Metro Phase 2’s Detailed Design Consultant (DDC) contract of station components. May 2023: Kochi Metro Rail (KMRL) would ink an MoU with the National Transportation Planning and Research Centre (NATPAC) soon, to undertake a three-month-long study which will help identify measures to increase ridership in Kochi Metro, and its waterway extension, the Kochi Water Metro. SYSTRA MVA Consulting recently was declared as the lowest bidder for the Detailed Design Consultant (DDC) contract of Kochi Metro Phase 2‘s Third Rail electrification system. July 2023: SYSTRA S.A. – SYSTRA MVA Consulting (India) Pvt. Ltd. JV was appointed as the General Consultant (GC) for Kochi Metro’s Phase 2 project. Aug 2023: On 05 August, 2023, Kochi Metro Rail (KMRL) initiated the piling work on Phase-II of the… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares