Kudankulam power project unit 3 & 4.

This Project Viewed 274 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Energy > Storage > Generation > Conventional > Nuclear
  • Status: ******
  • Capacity: ******
  • Product: Nuclear
  • Updated On: November 04 2025
  • Cost: Rs. 39,894.00 Crores

Location of the project

  • CityTirunelveli
  • StateTamil Nadu
  • CountryIndia

Project Details

  • Nuclear Power Corporation of India (NPCIL) in collaboration with Russia will soon take up the construction work of the third nuclear power plant at Kudankulam in Tamil Nadu. The company is likely to receive the techno-commercial proposal for Kudankulam III by June 2009. The project work is expected to start by 2009-end. It may be mentioned that Unit I and II at Kudankulam are at an advanced stage of completion and are expected to be commissioned this year (2009). Out of 6,000-MWe of generated power, NPCIL will supply 1,800-MWe electricity to Tamil Nadu and the balance power will be distributed to other Southern States. In January 2011, Bids were invited for engineering service contract for basic design, preparation of tender drawing , technical specification, other sections of tender document for the balance of plant structures systems components and out door pipe line network of Kudankulam nuclear power project 3 & 4 in Tirunelveli district of Tamil Nadu. Mar 2015: Phase-I work for setting up its third and fourth units will commence in April 2016. June 2016: Loading of 163 enriched uranium fuel assemblies into Kudankulam-II began on May 11, 2016 and it was completed on May 19, 2016. India's nuclear sector regulator has given the nod for the second 1,000 MW unit at Kudankulam in Tamil Nadu to go critical/start fission process. July 2016: NPCIL has started nuclear fission of the second unit of Kudankulam atomic power project in Tamil Nadu, on 10 July, 2016. The unit will start commercial generation in four to six months. Aug 2016: The second 1,000 MW unit of the Kudankulam Nuclear Power Project (KNPP) in Tamil Nadu has been connected to the grid on 29 August, 2016. July 2017 : Construction work at Unit 3 is under-construction and likely to be completed in little over six years. The total cost of Unit 3 and Unit 4 Each with capacity to produce 1,000 MW. June 2018: BGR Energy Systems have won two contracts from Nuclear Power Corporation of India for Kudankulam Nuclear Power projects - 3 & 4. The company has bagged Rs 3.45 billion order for design & detailed engineering, manufacture, procurement, supply, etc., of 400KV & 230KV Switchyards and BoP electrical areas for Kudankulam Nuclear Power projects 3 & 4, BGR Energy Systems said in a press release. The second order worth of Rs 862 million for loading/unloading, transportation & handling at site, storage, civil works, etc., of 400KV & 230KV Switchyards and BoP electrical areas for Kudankulam Nuclear Power projects – 3 & 4, it added. Sept 2018 ; Work on project is under… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares