Search Tips

East-West Kolkata Metro corridor project.

This Project Viewed 195 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro rail
  • Updated On: August 07 2024
  • Cost: Rs. 4,874.58 Crores

Location of the project

  • CityColachel
  • StateWest Bengal
  • CountryIndia

Project Details

  • The Kolkata Metro Rail Corporation (KMRC), a joint venture company with equal equity participation from the Centre and the State Government, is developing the East-West Kolkata Metro corridor project, the first ever in the country to run under a river, with an investment of Rs 4,874.58-crore. The central government will invest Rs 1,169 crore for the project through equity and subordinated debt, while the state government will spend around Rs 1,452.58 crore. The remaining Rs 2,253 crore will be funded by the Japan International Cooperation Agency (JICA) as a senior-term debt loan. The 13.77-km corridor would run from Salt Lake Sector V, the IT hub of the city, up to Howrah Maidan. Of this, around 8 km will be underground with six stations and the balance 5.77 km will be on an elevated track. The underground corridor starts from Howrah railway station and will cross the river Hooghly at a depth of 60 feet from the water level. Also, the proposal to extend the metro alignment up to Howrah Maidan from Howrah station covering an additional 900 metres at an added cost of Rs 198.58 crore was sanctioned by the Centre’s committee of empowered ministers recently. KMRC will shortly float another tender for the other section of the project, which is to pass under the Hooghly river, known as UG-I. KMRC has completed the technical evaluation for the UG-I and the contract could be awarded within a couple of months. Moreover, even for the construction of the underground stations, a top-down approach will be used wherein the upper sections of the stations will be built first and subsequently, the lower potions will be worked on. This will mean that surface transport will not be severely impacted. The entire project is expected to be commissioned by 2014. May,2010: The proposed East-West Metro, which will run 13 km from Salt Lake to Howrah station,to commence operations by 2012. Around 100 feet of the stretch, between Mahakaran (BBD Bag) and Howrah stations, will be under the Hooghly. The government has set 2012 as the deadline for starting the train service. The 12 stations on the route will be Howrah, Mahakaran, Central, Bowbazar, Sealdah, Phoolbagan, Salt Lake stadium, Bengal Chemical, City Centre, Central Park, Karunamoyee and Sector V. The route will intersect the existing North-South Metro at Central. March,2011: Siemens is to supply the complete railway electrification system for Kolkata's new Metro line. Siemens has received the order from the Kolkata Metro Rail Corporation. The contract includes project management, design, installation and commissioning work, in addition to personnel training and maintenance through the three-year warranty period. Construction will take place in two phases, with the first line section due for completion by the end of 2013. This section will be elevated over 5.77 km and cover six stations. The second section, which will be underground, is scheduled to open by 2014 end. It will be over 8.9 km with a tunnel under the Hooghly. The line will be completely electrified by Siemens Mobility with a 750V-DC traction power supply collected from a third rail system. The power will be supplied by the Calcutta Electric Supply Corporation. In November 2012: The West Bengal Government has offload its 50 per cent equity stake to the Railways July 2014:Work on project is in process. June 2015: The first phase of the proposed East West Metro railway services in Kolkata will be operational latest by June 2018. June 2016: The second phase, six percent of the work has been completed, is expected to be operational by August 2019. The project is facing delay and cost escalation. Dec 2018: IL&FS Engineering and Construction Company has received a letter dated 20 December 2018 from Rail Vikas Nigam to terminate contract due to slow progress on works awarded. June 2019 : East-West Metro will run between Sector V and Stadium stations, Distance of 5.5km with six stations on the stretch, in the first phase that is expected to be operational by July and e services will be extended up to Phoolbagan by the end of this year, July 2019: The work on East-West Kolkata Metro to connect Howrah and Sealdah is likely to be completed in 2021. Twin tunnels below the river Hooghly have been completed with the help of tunnel boring machines. Aug 2019: The East-West Metro’s Phase-I from Sector V to Salt Lake Stadium got a conditional nod for the launch from the Commissioner of Railway Safety (CRS) on 2 August 2019. Dec 2019 : In Nov East-West Metro corridor project likely to be delayed by approximately six months to one year and 16.6-km-long rapid transit system project, project was scheduled to be completed by June 2021, Feb 2020: Union Minister of Railways and Commerce & Industry, Piyush Goyal, inaugurated and flagged off Phase-I of East-West Metro corridor of Kolkata Metro connecting Salt Lake Sector-V and Salt Lake Stadium. Apr 2020: Jindal Steel and Power (JSPL) has bagged an order of 2,308 tonne head hardened rails of 1080 HH grade from the Kolkata Metro Rail Corporation. Oct 2020: Cabinet gives nod to Rs 8,575 crore East-West Metro Corridor project in Kolkata The total length of the project is 16.6 km and it will consist of 12 stations. It will connect Howrah on the West bank of the river Hooghly with Salt Lake City… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares