Delhi Metro Rail Corporation (DMRC) plans for Phase-IV of Delhi MRTS.

This Project Viewed 163 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: MRTS
  • Updated On: August 06 2026
  • Cost: Rs. 24,948.65 cr

Location of the project

  • City-
  • StateDelhi
  • CountryIndia

Project Details

  • Delhi Metro Rail Corporation (DMRC) plans for Phase-IV of Delhi MRTS. Delhi Metro Rail Corporation (DMRC) has invited bids for part design and construction of elevated viaduct, elevated ramp, siding lines, viaduct for connection to Mukundpur depot and four elevated stations viz Bhalswa, Majlis Park, Azadpur and Ashok Vihar [excluding architectural finishing works, steel FOB (except at Ashok Vihar station which is including) and PEB works of stations] from Ch 15206.166 mtr to Ch 22680.000 mtr of Janakpuri West to R K Ashram corridor (extn of Line-8) of Phase-IV of Delhi MRTS and partly integrated and partly independent flyover of PWD between Azadpur and Derawal Nagar on G T Road in Delhi. Dec 2019: YFC Projects has emerged as the lowest bidder (L1) for civil construction Package DC-04 of the Delhi Metro Rail Corporation (DMRC) Phase-IV project. DMRC has commenced construction work on Metro Phase-IV from Haiderpur Badli Mor on the Janakpuri West and R K Ashram Marg corridor. Feb 2020 : HCC-VCCL JV bags Rs 489 cr civil contract for Phase IV of Delhi Metro against the estimated value of contract worth Rs 478 crore. May 2020: DMRC has resumed construction work of its much-delayed Phase-IV project. June 2020: DMRC has started casting work of u-girders for Janakpuri West-RK Ashram Metro corridor. Aug 2020: DMRC has commenced preliminary work on the fifth Metro bridge over Yamuna river which is coming up on the Majlis Park-Maujpur Metro corridor. DMRC has commenced casting work of U-girders to be installed on 4.2 km long elevated section of the Aerocity-Tughlakabad Corridor. Apr 2021: Delhi Metro Rail Corporation has sought RMB's clearance for construction in the Southern Ridge, Central Ridge and parts of the Morphological Ridge for its Phase IV part of the project. May 2021: The Delhi Metro Rail Corporation Ltd has floated a global tender for the construction of a 6.981 km underground section under Package DC-07 between Sangam Vihar Station – Sarita Vihar depot including the construction of three metro stations of Phase 4 of the Delhi Metro Rail Project. Delhi Metro Rail Corporation is all set to start construction work on the underground section of Phase-IV of its upcoming Silver Line— the Aerocity-Tughlaqabad corridor. Aug 2021: A small segment of its Pink Line at Trilokpuri, which had proved a bottleneck for the Delhi Metro Rail Corporation (DMRC) authorities for a long time, has been inaugurated. Union Minister for Housing and Urban Affairs Hardeep Singh Puri and Delhi Chief Minister Arvind Kejriwal jointly inaugurated the section of about 289 mtr between MayurVihar Pocket 1 and Trilokpuri Sanjay Lake stations. Oct 2021: Delhi Metro Rail Corporation (DMRC) has planned to construct an integrated flyover-cum-metro viaduct structure along with a vehicle underpass. Nov 2021: The Delhi government has sanctioned the construction of an integrated structure having a flyover at the lower deck and a Metro line at the upper deck between the Metro stations at Yamuna Vihar and Bhajanpura. The Delhi government has sanctioned the construction of an integrated structure having a flyover at the lower deck and a Metro line at the upper deck between the Metro stations at Yamuna Vihar and Bhajanpura. Jan 2022: Afcons Infrastructure has been awarded Rs 1,669.20 crore contract by the Delhi Metro Rail Corporation (DMRC) for constructing Package DC07 of the 23.622 km Silver Line (Aerocity-Tughalakabad). Afcons Infrastructure has been awarded a Rs 2,481.50 crore contract by Delhi Metro Rail Corporation (DMRC) for constructing Package DC-05 of the Magenta Line’s 28.92 km Janakpuri West – RK Ashram extension. L&T Construction has won contract for design and construction of 5-km of twin tunnel (Up & Down Line) by Shield Tunnel Boring Machine (TBM), cut and cover tunnel box, underground ramp and four underground stations named as Chhattarpur, Chhattarpur Mandir, IGNOU and Neb Sarai with associated works of Aerocity to Tughlakabad Corridor of Phase IV of… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares