Search Tips

Construction of eight lane carriageway on Delhi-Vadodara Access Controlled Greenfield Alignment (NH-148N) in Rajasthan. (Package-15)

This Project Viewed 113 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Roadways > Road/Highway
  • Status: ******
  • Capacity: ******
  • Product: eight lane carriageway
  • Updated On: January 29 2021
  • Cost:

Location of the project

  • City-
  • StateRajasthan
  • CountryIndia

Project Details

  • Construction of eight lane carriageway starting from major bridge over Takli river near Nayagaon Jageer village to Rajasthan/Madhya Pradesh Border (Ch 427.300 to Ch 452.425) section of Delhi-Vadodara Access Controlled Greenfield Alignment (NH-148N) in Rajasthan. National Highways Authority of India (NHAI) has invited bids for construction of eight lane carriageway starting from major bridge over Takli river near Nayagaon Jageer village to Rajasthan/Madhya Pradesh Border (Ch 427.300 to Ch 452.425) section of Delhi-Vadodara Access Controlled Greenfield Alignment (NH-148N) in Rajasthan on EPC mode under Bharatmala Pariyojana. Oct 2019: NHAI has invited two separate bids for works of Delhi-Vadodara Greenfield Alignment (NH-148N)- Construction of eight-lane, access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at junction with SH-175 in Baletiya Village in Panchmahal district (ch 780.920 to 803.420; design ch 328.500 to Ch. 351.000). Construction of eight-lane, access-controlled expressway starting from junction with SH-63 near Pratap Nagar village and ending at junction with NE-1 near Dodka village of Vadodara district (ch 824.920 to ch 844.382; design ch 372.500 to Ch. 391.962). Oct 2019: NHAI has floated tender for construction of eight-lane carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch 331.030 to 359.170) section of Delhi-Vadodara Access Controlled Greenfield Alignment (NH-148N). Feb 2020: H G Infra Engineering (HGIEL) has been declared the lowest (L1) bidder for construction of eight-lane carriageway starting near junction with NH-11 A to Junction with MDR-1… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares