Search Tips

Dahisar-Andheri-Bandra (East) Metro 7 corridor.

This Project Viewed 221 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro rail
  • Updated On: January 20 2023
  • Cost: Rs. 6,208.00 Crores

Location of the project

  • CityMumbai
  • StateMaharashtra
  • CountryIndia

Project Details

  • MMRDA plans for Dahisar-Andheri-Bandra (East) Metro Rail project. The project reports have been drafted by Delhi Metro Rail Corporation (DMRC). MMRDA approved the detailed project report for a 16.5-km line from Andheri (East) to Dahisar (East) of Rs 4,737 crore which is a part of a 27-km Dahisar-Andheri-Bandra (East) Metro. Sept 2015: Maharashtra government is in the process of tying up with the Asian Development Bank (ADB) so that they partially fund the two elevated Metro lines - one that will connect Dahisar East with Andheri East. Nov 2015: AAI has given approval to allow the transfer of its land to MMRDA to house the depot of the Metro 7 corridor connecting Andheri East-Dahisar East. The central government’s department of economic affairs (DEA) has cleared a proposal for financial assistance from the Asian Development Bank (ADB) for the project. Jan 2016: Over 30 infrastructure companies, including HCC, Reliance Infra, AFCONS, L&T, J Kumar Infra, Unity Infra, recently evinced interest in bidding for the Andheri (East) to Dahisar (East) Metro VII corridor, which involves designing and constructing an elevated viaduct, and 16 stations. Feb 2016: MMRDA has come out with tenders to appoint 'Detail Design Consultants' for the Dahisar East - Andheri East metro alignment. Apr 2016: Simplex Infrastructure, JKumar Infraprojects and NCC have bagged the contracts for different packages of the 16.5 km Andheri (East) to Dahisar (East) Metro-7 corridor in Mumbai. May 2016: Work on the project is likely to be commence by September 2016. July 2016: MMRDA has appointed Ayesa Ingenieria Arquitectura SAV, a design consultant for the project. Sept 2016: MMRDA is going to appoint a consultant for construction of a multi-modal station to integrate the Dahisar-DN Nagar Metro-2A corridor and Dahisar (east)- Andheri (east) Metro-7 corridor. June 2017: The Maharashtra government has given three more plots for the Andheri East-Dahisar Metro-7 corridor. Collectively, these three plots measure 20,387sqm or 5.03 acre. July 2017: The state cabinet approved a bank guarantee of Asian Infrastructure Investment Bank’s (ADB) for the project. Apr 2018: MMRDA has revised its deadline from 2019 to 2020 for the project. Nov 2018: BEML has secured a contract worth Rs 3,015 crore for Mumbai Metro Corridor. The order includes manufacturing of 378 Metro cars (63 Metro trains of six cars each) for Mumbai Metro Corridor 2A, 2B and 7 respectively. Dec 2018 : Work on project will lay the foundation stone on today 18 Dec 2018. Mar 2019: The Asian Development Bank (ADB) and the Government of India have entered a loan agreement for the project. Alstom bags contract for to provide CBTC signalling system as well as a state-of-the-art telecommunication system for the elevated lines. May 2019: Around 68 percent of the civil work has been completed for Metro 7. Aug 2019: The MMRDA has installed its first escalator at Bandongri Station on the Andheri (East) to Dahisar (East) Metro-7 Corridor. Oct 2019: MMRDA is planning to conduct trials on the under-construction Metro Line 7 and Metro Line 2A by August 2020. Jan 2020 : Around 71 percent work is completed. MMRDA has invited bids for design and construction of balance works of Package-1, Line-7 elevated viaduct (excluding stations and station viaduct, architectural finishing and pre-engineered steel roof structure of station) from Ch(-) 525.903 mtr (pier P1E) to (+) 5801.297 mtr (pier P278) Andheri (East)-Dahisar (East) corridor. The scope of work also involves… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares