Delhi-Ghaziabad-Meerut RRTS project

This Project Viewed 186 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Rail-road
  • Status: ******
  • Capacity: ******
  • Product: RRTS corridor
  • Updated On: September 10 2025
  • Cost: Rs. 30274 .00 Crores

Location of the project

  • City-
  • StateUttar Pradesh
  • CountryIndia

Project Details

  • Implementation of Delhi-Ghaziabad-Meerut RRTS project. The RRTS will connect Meerut and Ghaziabad with New Delhi. Nov 2017: The central government has approved the DPR for the project which is expected to cost around Rs 33,000 crore. Feb 2018: Tenders for the Phase-I of the high-speed train project from Nizamuddin in Delhi to Meerut in Uttar Pradesh will be floated on 10 March 2018. The civil work of the project is expected to commence in July 2019. Mar 2018: The National Capital Region Transport Corpn has invited bids for consultancy services for Delhi-Meerut RRTS Corridor. June 2018 : Pre-constrution activities work is started for the project and likely to be completed in further 2024. Aug 2018 : As of July After getting the Centre's approval, NCRTC will begin work on the project within 45 days and will be completed by 2024. Sadbhav Engineering has been declared L1 bidder for onstruction of elevated viaduct from the start of elevated ramp near Sahibabad RRTS station up to the end of Ghaziabad RRTS Station and two elevated RRTS stations viz. Sahibabad and Ghaziabad The company has quoted a bid cost of Rs 542.49 crore for 7.5 km project. Sept 2018: Delhi-Meerut Rapid Rai project soon to get investment clearance. Nov 2018: The National Capital Region Transport Corporation (NCRTC) has invited bids for detailed design of track for elevated viaduct, underground sections including all stations and depots for Delhi-Ghaziabad-Meerut RRTS corridor. Feb 2019 :Central Govt has approved worth Rs 30,200 crore for the project. March 2019 : Work on project has been laid foundaion stone for the project and scheduled to be operational by 2024. May 2019 : Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) corridor, from Sahibabad to Duhai is likely to get started from March 2023 and the entire project – Sarai Kale Khan to Meerut is March 2024. The entire project will cost Rs 30724 crore, of which Rs 6500 will be shared by Uttar Pradesh government. July 2019 : Work on project will be completed elevated corridors first and the work on the entire 82km will go continuously. the work will start soon in Delhi and tenders are likely to be floated in another three months and Sahibabad-Duhai section of Delhi–Meerut RRTS likely to begin by 2023, respextively entire 82km section under phase 1 will going to open in March 2025. Aug 2019: KEC International has bagged order for construction of elevated viaduct and stations of the Delhi-Meerut Regional Rapid Transit System (RRTS) corridor, from National Capital Region Transport Corporation (NCRTC) of Rs. 580 crore. Sept 2019: NCRTC has issued a letter of acceptance (LoA) to the joint venture of KEC International and the China Civil Engineering Construction Corporation (KEC-CCECC JV). Feb 2020 : The Uttar Pradesh government has Awards Rs 900 Cr to Delhi-Meerut Rapid Rail Project In Budget and construction is in full swing as the work on the priority section between Delhi and Ghaziabad is already half-done. and ill be operational by 2025. The National Capital Region Transport Corporation has floated tender for design and construction of tunnels by TBM from near Brahampuri DN ramp to Begumpul UP ramp and three underground stations at Meerut Central, Bhaisali and Begumpul by cut and cover method including architectural finishing and design, supply, installation, testing and commissioning of electrical and mechanical system including fire detection and suppression systems and hydraulic systems. Mar 2020: The Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) corridor is likely to have three major multi-modal transportation hubs between Delhi and Ghaziabad. The three multimodal transport hubs have been planned at Anand Vihar in Delhi, at Shaheed Sthal (New Bus Adda) and at Sahibabad in Ghaziabad. Apr 2020: Larsen & Toubro (L&T) Construction has secured contract execute a new, dedicated, high speed, high capacity rail system in the Delhi-Gaziabad-Meerut Corridor. NCRTC has invited bids for construction of elevated viaduct from the end of Shatabadi Nagar Station to Brahampuri DN Ramp and Begumpul UP Ramp to Modipuram-end, including Modipuram Depot entry ramp and five elevated stations, namely MES, Darauli, Meerut North Modipuram and Brahampuri (excluding architectural finishing and pre-engineered steel roof structure of stations) of Delhi-Ghaziabad-Meerut RRTS Corridor. May 2020: The construction of phase-I of Delhi-Ghaziabad-Meerut corridor is started. June 2020: Shanghai Tunnel Engineering Company (STEC) has emerged as the lowest bidder (L1) for construction of an underground stretch of the Delhi-Meerut Regional Rapid Transit System (RRTS) project. Jul 2020: NCRTC launched the first precast segment on Delhi –Ghaziabad-Meerut RRTS corridor at P382 between Guldhar and Duhai on July 13, 2020. Aug 2020: The Asian Development Bank (ADB) has approved a $1 billion loan to support construction of the modern, high-speed Delhi–Meerut Regional Rapid Transit System. Financing for the project will be implemented in four tranches between August 2020 and May 2025. Sept 2020: The Asian Development Bank (ADB) and the Central government have inked a USD 500 million loan for Delhi-Meerut Regional Rapid Transit System (RRTS) corridor. Bombardier Transportation, won the rolling stock contract for the Delhi-Meerut Regional Rapid Transit System (RRTS), will begin the delivery of coaches from April 2022 onwards. Oct 2020: The New Development Bank (NDB) of BRICS countries has approved loan amount of USD 500 million for the Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) Project. Nov 2020: Larsen & Toubro (L&T) has secured order from NCRTC for construction of a 11 km viaduct including five elevated stations from Shatabdi Nagar to Brahmapuri and Begumpul to the Modipuram Depot, designed for speeds up to 180 km per hour with the average operational speed of 100 km per hour which is almost three times faster than that of Metros. The government of India, the Ministry of Housing and Urban Affairs, National Capital Region Transport Corporation and the New Development Bank (NDB) signed a loan agreement for lending USD 500 million for the Delhi-Ghaziabad-Meerut Regional Rapid Transit System Project. Nov 2020: Ircon International has received letter of award (LoA) for design, supply, installation, testing and commissioning of receiving sub-stations and associated works on viaduct and tunnel from Sarai Kale Khan to Duhai (EPE) (including Jangpura Stabling Yard and Duhai Depot) and SCDA system for complete corridor of Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) Corridor. The value of the contract is approximately Rs 318 crore. Ircon International has also received contract for design, supply, installation, testing and commissioning of receiving sub-stations and associated works on viaduct and tunnel from Duhai (EPE) to Modipuram (including Modipuram depot) for Delhi- Ghaziabad-Meerut RRTS Corridor. The value of the contract is around Rs 405 crore Jan 2021 : M/s Shanghai Tunnel Engineering Co. Ltd bags Rs 1,127 crore contract for construction of Tunnels for Delhi-Ghaziabad-Meerut RRTS corridor civil work tenders of the 82-km-long Delhi-Ghaziabad-Meerut corridor have now been awarded and Recently, foundation work for the RRTS viaduct near Dharamshila Marg, New Ashok Nagar in Delhi has started. Apr 2021: Work on the Delhi-Ghaziabad-Meerut corridor has started at Sarai Kale Khan alongside operational simulations in the virtual dimension. The 17-km-long priority section between Sahibabad and Duhai on the corridor is destined to be commissioned by 2023. May 2021: Wabtec will support Delhi-Meerut RRTS with $15-mn worth of components. Wabtec Corporation (NYSE WAB) will supply advanced technology brake systems, pantographs, roof disconnector switches and fully integrated passenger information systems to Alstom. June 2021: The construction of the launching shaft commenced on 13.06.2021 in Anand Vihar, Delhi for Tunnelling work. The first Diaphragm Wall (D-Wall) panel reinforcement cage of size of about 20 m deep (equal to height of a 10-storey building) and 5 m wide was… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares