Search Tips

Kottayam and Cherthala Greenfield Tourist Highway project on PPP basis : Scouting for consultant

This Project Viewed 117 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Roadways > Road/Highway
  • Status: ******
  • Capacity: ******
  • Product: Roadways
  • Updated On: January 13 2022
  • Cost:

Location of the project

  • CityKottayam
  • State-
  • CountryIndia

Project Details

  • The Government of Kerala propose to develop a Greenfield tourist highway connecting two important towns namely Kottayam and Cherthala. This stretch will also link two of the heavily trafficked corridors in Kerala viz. National Highway No. 47 and State Highway No. 1. The existing road linking Kottayam and Cherthala has poor geometrics and ribbon development, and some parts of this road get flooded during monsoon. The proposed highway will be of IRC standards, and will pave way for tourism and other developments of Kuttanad and Kumarakom. National Transportation Planning and Research Centre (NATPAC) had conducted a detailed feasibility study, drawn up the alignment and fixed boundary stones about ten years back. According to this proposal the ROW will be 100 metres from chainage 0 to 14.5 km and 45 metres from chainage 14.5 to 28.7 km. Out of the 100 metres, 45 metres would be used for the carriage width, median, service road, footpath etc and the rest of 55 metres for commercial development so as to make the project economically viable. Thanneermukkom bund and a short stretch of the existing road form part of this alignment. It was suggested to provide two lane carriage way to start with and widen it to four lane carriageway in due course. Salient Features of the Alignment of the Proposed Tourist Highway The project is to connect Kottayam and Cherthala by a Tourist Highway corridor with NH standards. As per… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares