Search Tips

Patna Metro Rail project.

This Project Viewed 289 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: July 21 2026
  • Cost: Rs. 17800 Crores

Location of the project

  • CityPatna
  • State-
  • CountryIndia

Project Details

  • In the first phase, Metro Rail services would be provided between Patna and Danapur and in the second between Patna Junction and Digha, both distances of 20 km each. - Corridor 1 (15Km): Saguna More-Bailey Road-Dakbangalow Chowk-Frazer Road-Gandhi Maidan - Corridor 2 (25Km): Danapur-Digha-Kurji-Raja Pul-Gandhi Maidan-Ashok Rajpath-Agamkuan-Didarganj(Patna City) The government also plans to construct a third Metro line from Patna Junction to Digha Ghat passing through the heart of the city The project is planned in the Public Private Partnership (PPP) model. The Centre would provide 20 per cent of the cost as Viability Gap Fund amounting to Rs 1,600 crore while the State government would spend a similar sum depending upon the final estimate of the project. The remaining amount would be borne by the private company involved in the construction of the Metro Rail. The project's total cost would be about INR 8000 Crore. The entire Metro System would be elevated. July 014: The Detailed Project Report (DPR) for the Patna metro rail project will be finalised by 31 August 2014 and then it will be sent to the Centre for approval. The state government has also approved routes for the metro rail project for which a survey was conducted by Rail India Technical and Economic Service (RITES). A Special Purpose Vehicle (SPV) will be set up by the Bihar government to fast track the Patna Metro rail project. The SPV will be named 'Patna Metro Rail Corporation' and will be formed on the lines of the Delhi Metro Rail Corporation for monitoring the construction. Dec 2015: Bihar CM has approved the Patna Metro Rail project. The Detailed Project Report (DPR) of the Patna Metro Rail project will be presented to the state cabinet for approval soon. The Rail India Technical and Economic Service (RITES) prepared DPR. Feb 2016: The Bihar government has approved the Rs. 16,960 crore metro rail project. The state government had asked the Rail India Technical and Economic Service (RITES) to prepare a feasibility report. Sept 2017: The DPR, which entails an estimated expenditure of Rs 16,960 crore, was given an in-principle nod on 22 December 2016. The state cabinet approved the project on 9 February 2017. Work on the Patna metro rail project will commence from 2019. Sept 2018: The Bihar cabinet recently gave its nod for constituting “Patna Metro Rail Corporation Ltd. (PMRCL)” as special purpose vehicle (SPV) for implementation of the metro rail project. RITES has submitted the revised Detailed Project Report (DPR) to the Urban Development and Housing department Oct 2018 : DPR has been prepared and is likely to be tabled in the next state cabinet meeting and target is to complete the project and functional in five years. Feb 2019: The Public Investment Board (PIB) has given its nod for the long-delayed Patna Metro Rail project. The Union Cabinet chaired by Prime Minister Narendra Modi has given its nod for Patna Metro Rail project comprising two Metro Rail corridors. On 17 February 2019, Prime Minister Narendra Modi laid the foundation stone of Patna Metro Rail project. July 2019 : Work on project will begin work in further 3 months. Sept 2019: The Bihar Cabinet approved the allotment of Patna Metro Rail Project work to the DMRC. Bihar government has entered into a memorandum of understanding (MoU) with the Delhi Metro Rail Corporation (DMRC) for construction of the Phase-I of the Patna Metro Rail Project. Jan 2020 : Govt To Lend Bihar Rs 5,400 Cr For Patna Metro Project , Construction on the project has yet to start and the project is expected to be completed within five years. April 2020 : Bihar Cabinet on approved the allotment of Patna Metro Rail Project work ,construction work will begin by the end of this year and expected to run on two corridors by 2024 and entire metro project in Phase-1 will be completed within 5 years June 2020: DMRC opened technical bids for 6.107 km long section construction, connecting Mahahi Pakri to New ISBT on 11 June 2020. The bids were submitted by five Indian firms. These five Indian firms include NCC, GR Infraprojects, Dinesh Chandra R Agrawal Infracon, Sam (India) Builtwell and SP Singla Constructions. The cost of the tender was Rs 514.924 crore. Sept 2020: DMRC has invited bids for design, supply, installation, testing and commissioning of receiving- cum-traction and auxiliary main substation including high voltage cabling from grid substation. The estimated value of the project is Rs. 116.74 crore. March 2021: In Jan Four Firms in race of underground civil works of Patna Metro Rail project and Patna Metro will achieve important milestone in two years, this route will start first. Jul 2021: The Delhi Metro Rail Corporation has invited bids for supply, installation, testing and commissioning (including integrated testing and commissioning) of 25 kV overhead equipment (OHE) system, switching posts, 33 kV ring mains, auxiliary sub-stations for elevated sections and SCADA system for underground and elevated sections for Corridor-1and -2 and ISBT Depot of Patna Metro Rail Project in Bihar. The estimated value of the work is Rs. 144.65 crore. Oct 2021: The Patna district administration has issued a notification under Section 11 of the Land Acquisition Act, 2013 to acquire 76 acre of land between the Zero Mile and Patliputra Interstate Bus Terminal (ISBT) for the Patna Metro rail project. The acquisition process will be completed by February 2022. Nov 2021: Asian Development Bank (ADB) has agreed to finance the Patna Metro Rail Project involving an ₹13,365.77 crore investment. Dec 2021: KEC International Limited has emerged as the lowest bidder for design, supply, installation, testing and commissioning of receiving cum traction and auxiliary main substation including high voltage cabling from grid substation under Package PE-01 for the Patna Metro Rail Project – Phase I. The required land for Corridor-II of the project was transferred to the Patna Metro Rail Corporation (PMRC) and a no-objection certificate was also acquired from the departments concerned. The transfer of 1,340 sq mtr land on Fraser Road is under the process. Another 76-acre land for construction of ISBT Patna Metro Rail Depot and ISBT station is being acquired by the district administration. The state government has sanctioned Rs 1,000 crore for land acquisition. The Delhi Metro Rail Corporation (DMRC) awarded Larsen & Toubro (L&T) and YFC-MCL JV with two major civil construction contracts for Patna Metro’s Phase-1 project. PC-03 was awarded to L&T for Line-2’s eight km Rajendra Nagar-Patna Junction Railway Station section with six underground stations. PC-04 was awarded to YFC-MCL JV for Line-1’s four km Danapur-Patliputra Ramp section and four km Mithapur Ramp-Khemni Chak section with seven elevated stations. Jun 2022. : The Patna metro rail project is likely to be stalled due to difficulties in land acquisition and funds shortage.Patna Metro underground metro stations construction to start soon Aug 2022: Chief Minister of Bihar Nitish Kumar and Deputy CM Tejashwi Prasad Yadav jointly launched the commencement of construction work on the underground Metro section of Corridor-II Patna Junction to Patliputra Bus Terminal at Rajendra Nagar. The work on the elevated (overground) section of Corridor-II of Patna Metro is in progress as it is a priority corridor. Oct 2022 : In Sept Tunnelling for the underground portion of Corridor II of Patna Metro rail project is expected to begin in November this year. Feb 2023: NCC Ltd. recently erected their first 27.90m U-Girder for constructing Patna Metro Phase 1’s 6.107 km Priority Corridor connecting Malahi Pakri – New ISBT. Apr 2023: Larsen & Toubro recently commissioned DZ1090 – the 1st of four tunnel boring machines for 30.91 km Patna Metro Phase 1 project’s 8 km underground Package PC-03 connecting Rajendra Nagar – Patna Junction Railway Station. Aug 2023: The upcoming Rajendra Nagar Metro station will be underground and a three-level structure after the Patna Junction Metro station. The proposed Metro station of corridor - II will be connected to the Rajendra Nagar Terminal station as well, construction of which started a fortnight back. The project is likely to be completed in three… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Not Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares