Search Tips

New BG Railway Line from Jiribam to Imphal (ingull sweTupul).

This Project Viewed 128 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Rail-road
  • Status: ******
  • Capacity: ******
  • Product: Rail-road
  • Updated On: July 18 2023
  • Cost: Rs. 3,056.85 Crores

Location of the project

  • CityImphal West
  • State-
  • CountryIndia

Project Details

  • Indian Raiway is constructing a new BG Railway Line from Jiribam to Imphal (Tupul). In April 2012: HCC has bagged a Rs 162-crore order from North Frontier Railway to develop a rail tunnel. June 2014: The Indian Railways' is aiming to finish work at the 84-km-long Jiribam-Tupul segment of the new rail line project between Jiribam to Imphal by March 2016. The Jiribam-Tupul section will require a total 1,310 hectare of land and of this, work is in progress in 1,263 hectares. There will be 112 minor bridges, six major bridges, three road over-bridges (ROB) and two road under-bridges (RUB). Out of that, work on 52 minor bridges has been completed. Construction of ROBs and RUBs has also been completed. The project will have 34 tunnels totaling 39,401 metres and of that tunneling work for 18,152 metres has been completed till now. There will be six new station buildings, out of which work for one station building is in progress. Besides, 12.5 km track linking the main line from Jiribam to Dholakhal section and 1.20 km of loop line have also been completed. Project is expected to be completed by March 2016. Dec 2015: The Northern Frontier Railway (NFR) has deferred the completion target date of the railway track construction work on the Jiri-Tupul route to March 2017. Feb 2017: Around 12.5 Kms of the railway line has been completed. There are 45 tunnels and more than 100 major and minor bridges along the railway line from Jiribam to Imphal. Till January2017, Rs 595 crore has been invested for the railway project. Jan 2018: Tribeni Construction-Brahmaputra joint venture (JV) has emerged as the lowest (L1) bidder for construction of tunnel No. 18A (double track) in Awangkhul yard of around 200 mtr in length at 77,070.00 km to 77,270.00 km, and construction of cut and cover in between T/19 P2 and 20/P1, along with other ancillary work in connection with construction of the new BG railway line project Jiribam-Tupul in Imphal, Manipur. May 2018: The Northeast Frontier Railway has invited bids for onstruction of substructure of bridge no 134 (2x71.50 mtr) at 71.463 km, bridge no 136 (2x71.50 mtr + 2x30.00 mtr) at 73.163 km, bridge no 138 (3x30.00 mtr) at 73.91 km, bridge no 147D (1x30.00 mtr) at 83.26 km, bridge no 174 (3x30.00 mtr four-line track) and chum test of piles of bridges no 148, 169A, 169B, 169C, 171, 172 and 174 including other ancillary works in connection of construction new BG line from Jiribam to Imphal project. Nov 2018: As of Oct ; Work on project is going on in full swing. Project will be completed by the year 2020. Jiribam-Silchar Passenger train is completed the 1st BG train connecting the State July 2020 : In June Work on project is under-process and is projected to be completed by March 2022. Feb 2021: Work on project is under construction and scheduled for completion in further 2022. Apr 2021: Bids are invited for balance work of construction of foundation and substructure (including pile foundation, piers, abutment, bed block etc.) of major bridge no.164(span1x71.50m+5x106.00m+1x71.50m+1x30m… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares