Rishikesh-Karanprayag rail project.

This Project Viewed 151 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Rail-road
  • Status: ******
  • Capacity: ******
  • Product: Rail-road
  • Updated On: July 13 2026
  • Cost: Rs. 16,216.00 Crores

Location of the project

  • City-
  • StateUttarakhand
  • CountryIndia

Project Details

  • The 125-km long railway line was sanctioned by the Railway ministry in 2010 and Rs 4,295 crore has already been earmarked in the Railway budget. The project, which was earlier entrusted with the engineering wing of the Northern Railways, would now be undertaken by the Railways Vikas Nigam. The corporation has been given 5-10 years to lay the line and construct 12 stations, 81 tunnels and a 65-mt high bridge. May 2015: The bids have been invited for consultancy services of Geo-technical Investigation at bridges, tunnels and other specified locations on the railway alignment, in new Rishikesh-Shivpuri section (6.0-20.0 km) of 125 km new broad gauge rail link between Rishikesh and Karanprayag, in the state of Uttarakhand. Aug 2016: RVNL has invited bids for a Geo-technical investigation 1. At bridges, tunnels and other specified locations on the railway alignment in Srinagar-Tilani section (km 73.235 to km 91.740) of the 125 km new broad gauge rail link between Rishikesh and Karanprayag (Package-4). 2. At bridges, tunnels and other specified locations on the railway alignment in Dhali-Gholtir section (km 91.740 to km 108.550) of the 125 km new broad gauge rail link between Rishikesh and Karanprayag (Package-5). 3. At bridges, tunnels and other specified locations on the railway alignment in Tilani-Sivai section (km 108.550 to km 126.196) of the 125 km new broad gauge rail link between Rishikesh and Karanprayag (Package-6). Dec 2017: Work has begun on the 125 km long Rishikesh-Karnaprayag railway line project in Uttarakhand. Dec 2018 : In Oct Work on project is under-construction and line will become functional by 2024-25. May 2019: RVNL has invited tender for construction of tunnels , bridges and formation works from chainage 18+444 to 33+097 under package–2 in connection with new bg line between rishikesh and karanprayag (125km) in state of Uttarakhand Sept 2019 : Virbhadra-Rishikesh rail line is expected to become functional by 2019-20, while the rail line from New Rishikesh to Devprayag will become functional by 2023-24. The last stretch to be constructed under the project will be the one from Devprayag to Karanprayag and is expected to become functional by 2024-25. Feb 2020: Rail Vikas Nigam has floated tender for construction of tunnels, bridges, yards and formation works from Ch 101.310 to 117.365… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares