Search Tips

Ministry of Road Transport & Highways Plans to build Bangalore-Chennai expressway

This Project Viewed 163 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Roadways > Road/Highway
  • Status: ******
  • Capacity: ******
  • Product: Roadways
  • Updated On: October 21 2025
  • Cost: Rs. 14,870 crore

Location of the project

  • City-
  • StateMultiple
  • CountryIndia

Project Details

  • Ministry of Road Transport & Highways Plans to build Bangalore-Chennai expressway . The feasibility study is being carried out. The alignment of the expressway has been finalized. The approval from the State Government of Karnataka, Andhra Pradesh and Tamil Nadu has been obtained for the alignment. The proposed six-lane expressway would serve as an alternative to the present popular NH 7 from Bangalore to Krishnagiri, NH- 46 Krishnagiri to Ranipet and NH 4 Ranipet to Chennai route, which is 372 km long and witnessing a significant increase in traffic. The project, proposed under the National Highways Development Project Phase VI, would take the Kolar, Chittoor route and have 12 major intersections in all. It would be a toll road facility. The project report may be ready by September. The process for land acquisition has been initiated and villages involved along the proposed alignment of the expressway in the three States have been finalised and proposal for publication of 3 (a) Notification is under preparation. Aug 2015: The government has cleared expressway plans of Bengaluru-Chennai. Aug 2017: The government has given its approval for sections of Bengaluru -Chennai (334 km). May 2018: MoEF&CC has granted terms of reference (ToR) for Bangalore-Chennai Expressway Phase-I from Bengaluru at 0.00 Km to 71.00 km near village N.G. Hulkur, Bangarpet taluk, Kolar district in Karnataka (length 73.050 km including Spur alignment of 2.05 km) on EPC basis under Bharatmala (Phase-I). MoEF&CC has accorded terms of reference (ToR) to Phase-II of Bangalore-Chennai Expressway from 71.000 km near Village N G Hulkur, Taluka Bangarpet, Kolar district in Karnataka and ends at 156.000 km near village Ramapuram, Mandal Gudipala, Chittoor district in Andhra Pradesh. The length of Phase-II will be 85 km. Apr 2019: With 90% of land acquisition complete, work on the 262-km-long Bengaluru-Chennai Expressway (BCE). Tenders for the concessionaire under the Hybrid Annuity Mode (HAM) are likely to be called soon. Aug 2019: The development of the six-lane corridor between Maduravoyal and Sriperambudur is envisaged as a part of Bengaluru-Chennai Expressway. The detailed project report (DPR) has been prepared for the project. Feb 2020 :The processes of getting environment clearances and other pre-construction activities have been initiated and are under progress. Aug 2020 : In July MoRTH speeds up ₹20,000-cr Chennai-Bengaluru e-way and transport ministry has resumed the land acquisition process for the mega highway project. Oct 2020: NHAI has invited bids for construction of expressway from ch 127.000 to ch 156.000 (Bangarupalem to Gudipala section) in Andhra Pradesh under Bharatmala Pariyojana on hybrid annuity mode (HAM) (Phase-II, Package-III). The estimated value of the work is Rs. 918.27 crore. The NHAI has invited bids for construction from 156.000 km to 180.000 km, Gudipala-Walajahpet section in the state of Andhra Pradesh and Tamil Nadu under Bharatmala Paryojana on hybrid annuity mode (HAM) (Phase-III, Package-I). The estimated cost of the project is Rs 931.85 crore. Oct 2020: The land acquisition has been completed for Bengaluru-Chennai Expressway project. The work on Bengaluru-Chennai Expressway will also commence soon. Nov 2020: Last Date for Submission of bids for from 156.000 km to 180.000 km, Gudipala-Walajahpet section is 23-11-2020. NHAI has invited bids for four-lane expressway from 26.400 km to 53.500 km of Malur to Bangarpet section of Bangalore-Chennai Expressway in Karnataka (Phase-I, Package-II) on DBOT or hybrid annuity basis under Bharatmala Pariyojana. The estimated value of the project is Rs 1,035.59 crore. Feb 2021: The Bengaluru-Chennai Expressway of 278 km will be initiated in FY21. Construction will begin in 2021-22. Dilip Buildcon has been declared as the lowest (L-1) bidder for construction of four-lane Bangalore-Chennai Expressway from 127.000… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares