Chennai Metro Rail is executing metro rail project.

This Project Viewed 351 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro rail
  • Updated On: June 23 2022
  • Cost: Rs. 14,600.00 Crores

Location of the project

  • CityChennai
  • StateTamil Nadu
  • CountryIndia

Project Details

  • Chennai Metro Rail (CMRL), a special purpose vehicle floated by the State and Centre with 50 per cent investment each, has taken up the development of the Chennai Metro Project. Phase-I, comprising two corridors, covering a length of 45.046 km at a cost of Rs 14,600 crore, has been approved by the Cabinet. The total length to be covered is 45.046 km in two corridors. One corridor will be 23.085 km (out of which 14.3 km will be underground) from Washermanpet to Chennai airport and another 21.961 km corridor will be from Chennai Central to St. Thomas Mount (including 9.695 km underground stretch). The detailed project report for the project was done by Delhi Metro Rail Corporation. The Hyderabad-based Soma Enterprise has been awarded a Rs. 199-crore contract. Soma will set up a 4.5-km stretch of the elevated viaduct running along the 100-ft Inner Ring Road between Koyambedu and Ashok Nagar. The Consolidated Construction Consortium Ltd (CCCL) has bagged contracts totalling Rs 180 crore for constructing 10 elevated stations for project. Jan 2014: Chennai Metro Rail Limited (CMRL) terminated its contract with Consolidated Construction Consortium Limited (CCCL). CCCL was responsible for the construction of stations including Koyambedu, CMBT, Arumbakkam, Vadapalani, Ashok Nagar, Ekkatuthangal, Alandur and St. Thomas Mount. Thus a further delay in the trial run and operations is expected. Jan 2014: Trial run of Chennai Metro Rail was conducted recently on a 1.5 kilometre stretch from the Koyambedu yard to the shunting neck. Feb 2014: Trial run was conducted from Koyambedu to Ashok Nagar. Mar 2014: CMRL had floated tenders in February 2014 but there was no response from other contractors. CMRL has once again called for tenders. May 2014: The cost of the project is likely to escalate from the current estimate of Rs. 14,600 crore to nearly Rs. 20,000 crore due to a variety of factors, including Rupee depreciation and increase in the construction and labour costs. Chennai Metro Rail Limited (CMRL) that is executing the project is seeking additional funds to complete its work. Sept 2014: The Chennai Metro Rail will be launched in March 2015 between Koyambedu and Alandur section. Nov 2014: CMRL plans to connect Vadapalani Metro station with Forum Vijaya mall. Mar 2015: CMRL has failed to meet its second deadline of March 2015 to begin the first service between Koyambedu and Alandur. June 2015: Chennai Metro Rail is likely to be inaugurated soon. Services on the 10-km Alandur-Koyambedu stretch started recently. Mar 2016 : The CMRL plans to commission the service between Alandur and Chennai airport by end of March 2016 even as construction of stations is progressing in this section. July 2016: The construction of… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares